Vertical-Mounted Dual-Rail Conveyor: Carriage Geometry, Chain Pitch and Index Timing

How a carriage bridging two rails, a 37-tooth chain pitch and a five-second step lock together — worked through one delivered 20-carriage Vertically Mounted Dual Rail Conveyor?

Author: Mr. Xu ChangMing, engineering director, C Motion Limited | 2nd,Sept 2015 | Category: Technical Guide

Most closed-loop conveyors carry the workpiece on a single guide path. A dual-rail machine does something structurally different: one rigid carriage plate spans two parallel closed loops, each with its own rail, its own chain and its own sprockets. That changes the questions worth asking. Load capacity stops being a single number. Chain synchronisation becomes a real constraint. And the carriage — not the rail — becomes the part that sets almost everything else.

This guide works through that architecture using one signed and delivered project as the reference throughout: a vertical-mounted oval dual-rail conveyor, 7.5 metres long, twenty carriages on forty slides, indexing one 740 mm station every five seconds, with mechanical secondary positioning at the working stations.

For standard configurations, layout options and what a catalogue build includes, see the Vertically-Mounted Dura Parallel Circular Rail Conveyor System product page. For the arithmetic of a single-rail loop, see the companion calculation guides on timing belt and long-oval chain systems. This guide picks up where those leave off: what a second guide path adds.

A note on the example. Figures below come from the signed technical specification confirmation form, the configuration list and the assembly instruction for one delivered C Motion project, system code TMB02-T23-S300R180-Y740-20LK20-L7139-C20. They are used to show how the relationships work, not as a specification to copy. Your own module lengths, chain designation and component ratings must come from the documents for what you actually specify.

3D assembly of a vertical-mounted dual-rail circular conveyor with 180-degree return modules

3D assembly of the complete dual-rail loop: 3D assembly of a vertical-mounted dual-rail circular conveyor with 180-degree return modules

  1. Forty slides are twenty carriages in this Vertically Mounted Dual Rail Conveyor

The first number to read correctly is the slide count, because on a dual-rail machine it is not the carriage count.

Each carriage in this project is a plate spanning both guide paths, carried on two slides — one running in the left rail, one in the right — tied together by a slide connecting plate. So the configuration’s forty slides, forty carrier-side locating accessories and forty chain connection blocks all describe twenty carriages. The twenty slide connecting plates, twenty locating arms and twenty locating followers describe the same twenty carriages from the other side of the count.

That distinction has to be settled before any capacity discussion, because the documented 10 kg payload is per carriage, not per slide. Twenty carriages therefore put 200 kg of workpiece and fixture into circulation, and every gram of it accelerates on every index.

It also means the carriage is a structural member, not a mounting plate. It transmits process force into two separated guide paths, it holds the two rails’ relative geometry through its own stiffness, and it has to survive being driven by two chains that are not physically connected to each other.

Circular Conveyor Line Manufacturing Facility

Factory photo before carriage plates were fitted: Dual-rail circular conveyor during assembly showing two parallel guide paths and cross-carriage structure

Vertical-mounted dual-rail circular conveyor with carriage plates installed — place directly after the bare-machine image as a before/after pair

Finished machine with carriage plates installed: Vertical-mounted dual-rail circular conveyor with carriage plates installed — place directly after the bare-machine image as a before/after pair

  1. The fixture defines the carriage; the carriage defines everything else

It is natural to describe a conveyor from the track outward. For dual-rail design the opposite order is more useful, because rail spacing is a consequence rather than a choice.

The chain runs: workpiece → fixture → carriage plate → slide connecting plate → slides → rails → frame. Each interface changes what the next component sees. A small component can sit on a large fixture, and that fixture may need clamps, inspection targets, pneumatic connections or robot access. The size of the tooling, not the workpiece, is usually what decides whether one guide path or two make sense in the first place.

Six inputs should be settled at carriage level before rail spacing or drive sizing begins: plate footprint and thickness, tooling and workpiece mass, centre-of-gravity position relative to the two rails, process force magnitude and direction, cable or pneumatic routing onto a moving carriage, and the access an operator or robot needs at the station.

Two of those deserve emphasis on a dual-rail machine. Centre of gravity relative to rail spacing determines how the load actually splits — two rails do not automatically mean fifty per cent each, and an offset load produces a moment that the carriage stiffness and the two guide reactions share in a proportion that depends on the whole assembly. And process force direction matters more than magnitude: a downward press is reacted comfortably by two separated guide paths, while a lateral or twisting force loads them very differently.

The carriage plate in this project uses a customer-defined hole pattern rather than a standard conveyor grid. That is the normal division of responsibility on this architecture — the travelling mechanism is standardised, the upper fixture interface is not.

  1. Carriage pitch is a whole number of chain teeth in Vertically Mounted Dual Rail Conveyor

This is the relationship that fixes the loop, and this project documents it explicitly rather than leaving it to be derived.

Carriages are attached to the chain at a fixed interval, so the pitch has to land on a chain tooth. The signed confirmation form records the carriage centre distance as 740 mm, annotated as 37 teeth, and the drive sprocket as 26 teeth at 20 mm pitch. Everything else follows:

Quantity Calculation Result
Chain pitch from the sprocket specification 20 mm
Carriage pitch in teeth 740 mm ÷ 20 mm 37 — a whole number ✓
Chain length per rail 20 carriages × 740 mm 14,800 mm
Chain links per rail 14,800 mm ÷ 20 mm 740 links
Links between carriages 740 ÷ 20 carriages 37 ✓

The configuration list carries two 14,800 mm chains, one per rail. The arithmetic closes exactly.

The practical consequence is that carriage pitch and carriage count are not two independent requests. On a 20 mm chain the available pitches near 740 mm are 720, 740 and 760 mm; nothing exists in between. A requirement expressed as “roughly 750 mm” has to resolve to one of those before the loop perimeter, the carriage count and the station layout can be settled, and the tolerance in the signed form — 740 +0.3 mm — is the manufacturing band on that fixed value, not a design range.

Settle this at enquiry stage. It is the point at which an approximate spacing becomes the number every other dimension is built around.

  1. Two loops, and where the sprockets sit in this Vertically Mounted Dual Rail Conveyor

The rail and the chain are separate closed curves of different length, and both can be calculated from the delivered configuration.

Carriage path (guide rail) Chain path
Straight sections 2 × 7,139 = 14,278 mm 14,800 − 520 = 14,280 mm
Return sections 2 × 180° at R150 = 942 mm 2 × 180° = 360° = 26 × 20 = 520 mm
Closed loop total 15,220 mm 14,800 mm

Chain sprocket fitted inside the 300 mm return module of a dual-rail circular conveyor

Return-end detail showing the sprocket inside the rail return: Chain sprocket fitted inside the 300 mm return module of a dual-rail circular conveyor

Two things stand out.

The straight sections match to within a millimetre. 7,140 mm of chain against 7,139 mm of rail per side means the sprocket centres sit effectively on the rail arc centres — the chain and the carriage separate only inside the return, not before it. That is worth knowing because it makes the transition zone predictable: interference checks can be run against the return module’s own footprint rather than an extended zone either side of it.

The returns differ by 422 mm across the loop. The carriage follows a 150 mm rail radius while the chain follows an 83 mm sprocket pitch radius, so the same 180° sweep produces very different arc lengths. Two consequences follow.

The carriage-to-chain connection has to float. Across a lap each carriage travels 15,220 mm while its attachment on the chain travels 14,800 mm, at different radii through the returns. The forty purpose-made connection blocks with bronze bushings — one per slide — exist to absorb that, and they are a wear interface worth asking a supplier about specifically.

And the carriage accelerates through the return. The ratio here is 942 ÷ 520 ≈ 1.81: a carriage travels roughly eighty per cent faster through the return than along the straight, and accelerates into and out of it even at constant chain speed. That is a much sharper transition than a large-radius loop produces, and on this machine it acts on a wide plate rather than a compact carrier. It is the strongest argument for reviewing the return as a dynamic event rather than a geometric one.

There is also a clearance figure worth recording: the 26-tooth sprocket has a pitch radius of about 83 mm inside a 150 mm return radius, leaving roughly 67 mm for the rail, the chain guide channels and the carriage structure. On a chain loop the return diameter is not a free choice — the sprocket sets its lower bound.

  1. On a vertical-mounted loop, the return inverts the carriage

Mounting orientation is not a packaging decision. On this machine the closed loop lies in a vertical plane: carriages travel along the top run, turn through a 300 mm return, and come back underneath.

That produces conditions a horizontal loop never sees. The carriage rotates through 180° at each end and travels the return run inverted. Gravity, which presses the carriage onto its guide along the top run, hangs it from the same guide on the return. Guide preload therefore has to be effective in both directions, and anything on the carriage that is merely resting rather than retained will not survive the first return.

Three design consequences follow:

Fixtures must retain, not support. Any workpiece still on the carriage when it enters the return has to be positively held. In practice this usually means the process sequence unloads before the return, or the fixture clamps.

Cable and pneumatic routing has to tolerate inversion. Anything running to a moving carriage passes through 180° of rotation twice per lap, every lap. At a 100-second lap that is over 700 inversions per shift.

Vertical mounting buys floor area and spends height. This machine occupies 7,469 × 875 mm of floor at 900 mm tall, with the return run using space directly beneath the working surface. Compare that against a horizontal loop of similar carriage count, where the return run occupies floor area alongside the working run.

  1. What a five-second step actually contains

The confirmation form records a step of five seconds. That is a cycle definition, not a conveyor speed rating, and the drive package shows why.

The motor is rated at 3,000 rpm through a 50:1 reducer, so the sprocket turns at up to 60 rpm. With 520 mm of chain per sprocket revolution, the maximum chain speed is:

3,000 ÷ 50 ÷ 60 × 0.520 m = 0.52 m/s

That is a hard ceiling set by the drivetrain, and it determines the fastest possible index. Using the documented minimum ramp of 200 ms at each end and a trapezoidal profile:

Parameter Data
Peak chain speed 0.52 m/s (drivetrain limit)
Acceleration 2.6 m/s²
Ramp up / constant / ramp down 0.20 s / 1.22 s / 0.20 s
Minimum index time for a 740 mm move ≈ 1.62 s
Remaining within the 5 s step ≈ 3.38 s

So roughly a third of the step is transport and two thirds is available for settling, mechanical locating, the process itself and locator release. The average conveying speed over the whole step is 148 mm/s, and a full lap of twenty stations takes 100 seconds.

This is the calculation worth doing early on any indexed machine, because it answers a question that a “5 second cycle” specification hides: is the conveyor the constraint, or is the process? Here it is clearly the process — there is more than twice the transport time available for work. Had the numbers come out the other way, the conversation would have to move to a lower reduction ratio, a larger sprocket or a faster-rated motor before the station design was fixed.

When specifying, separate the two figures the supplier actually needs: the index time the move plus settling may take, and the dwell time the carriage must stand still. A single cycle-time number cannot be sized against.

  1. The 200 ms ramp is a load specification

The signed documentation carries an explicit instruction: set acceleration and deceleration time to no less than 200 ms each. It reads like a comfort setting. It is not — it is a load limit, and the arithmetic makes that exact.

For a given move, chain force scales inversely with ramp time. Halving the ramp doubles the acceleration, and therefore doubles the chain tension, the sprocket torque, the reducer output torque, the motor torque, the reaction at every carriage-to-chain connection block, and the moment applied to the fixture through the carriage plate. Cutting 200 ms to 50 ms multiplies all of them by four.

That relationship holds regardless of what the actual moving mass turns out to be, which is what makes it a specification rather than a recommendation. The moving mass on this machine is substantial — twenty carriage plates, forty slides, two 14.8 metre chains, and up to 200 kg of workpiece and fixture — and all of it responds to the ramp setting.

Three practical points follow. A commissioning engineer tuning for a faster cycle can quietly overload a correctly sized drivetrain from the controller, without changing a single component. The setting should therefore be recorded as a machine parameter with a stated minimum, not left to whoever last touched the motion program. And when a machine that ran cleanly at handover starts showing chain wear, connection block wear or repeatability drift, the ramp settings are worth checking before the mechanics are stripped.

  1. Twenty positioned carriages, twelve actuators in this Vertically Mounted Dual Rail Conveyor

All twenty carriages in this project can be located at a station, and the configuration achieves that with twelve pneumatic cylinders and twelve locating shafts, supported by twenty-four bearing seats.

The carrier side and the station side are counted differently, and reading the list correctly explains the architecture:

Component Qty What it belongs to
Locating arms 20 One per carriage
Locating followers (cam followers) 20 One per carriage
Carrier-side locating accessories 40 One per slide — both guide paths
Pneumatic cylinders 12 Station side
Locating shafts 12 Station side, one per cylinder
Shaft bearing seats 24 Two per shaft, supporting both ends

Twelve actuators serving twenty positioned carriages means some shafts span a carriage pitch and act on two carriages at once. That is possible only because every carriage is clamped to the same chain at a fixed 37-tooth interval, so adjacent carriages arrive together and always sit exactly 740 mm apart on the straight. On a system where carriages move independently, or where spacing can drift, pairing cannot be done.

The trade-off is that paired stations lose independence — two carriages on one shaft clamp and release together and must share a dwell time. If one of those stations needs to hold longer, or to release early after a failed inspection, it has to be broken onto its own actuator. That is why number of carriages requiring positioning and number of positioning actuators belong on a requirement form as two separate lines, together with a note on which stations need independent release.

  1. Transport position, index position, process position

Repeat positioning measurement on a carriage at a locating station

Carriage at a locating station with the dial indicator in shot: Repeat positioning measurement on a carriage at a locating station

The documented operating sequence is precise about this, and it is worth reading closely:

home → index one station → settle → engage the secondary correction mechanism → process → retract the correction mechanism → index again

Six machine states, of which only one is conveyor travel. The sequence makes explicit that the servo does not establish the working position. It performs transport — bringing the carriage from one station into the capture range of the next. A separate mechanical device then establishes the datum for the process.

That division is what makes the specified ±0.05 mm repeat positioning accuracy achievable and, more importantly, repeatable. A servo asked to hold position through a chain is working against chain compliance, reducer backlash, guide clearance and whatever the station applies to the carriage. A mechanical locator removes that whole chain from the equation at the moment accuracy matters.

It also means an accuracy figure is meaningless without a measurement point. Motor encoder resolution, carriage index repeatability, locator repeatability, fixture repeatability and final workpiece position are five different quantities in sequence: servo command → reducer and transmission → chain and carriage → guide-rail geometry → carriage plate and slide connecting plate → locator → fixture → workpiece.

When specifying, say where the accuracy is required and what acts on the carriage there. “±0.05 mm at the working stations, with a downward press applied at three of them” is specifiable. “High accuracy” is not.

A single origin sensor serves the whole machine. Because every carriage is fixed to the chain at 37-tooth intervals, once the loop is homed the controller knows where all twenty are by counting from that datum — there is no need for a sensor per carriage position. A design that requires one usually indicates carriages that are not positively linked to the drive.

  1. Segmented construction: frame first, then rails, then chain

A 7.5 metre machine is built, tested and then taken apart for shipping. Getting it back together is not one alignment problem but three, and the documented assembly sequence handles them in a deliberate order.

Frame before rail. The base plates are engraved at their joints with matched references — A1/B1 and A2/B2 — identifying which segments belong together and in which position. The sequence draws the corresponding base plates together first, then adjusts the support feet until all three sections share one horizontal reference, with a spirit level recommended for the check. Only then are the locating pins driven home and the remaining fasteners tightened. The order matters: attempting to correct a misaligned frame by shifting the guide rail introduces rail stress and inconsistent mounting conditions that the machine then carries for its whole life.

Rail joints are a dynamic specification, not an assembly step. The straight rails carry letter-and-number engraving matching the base plate references. The documented procedure is unusually practical: bring the rail screws to a partial preload, run a finger across the joint to assess misalignment, tap left or right with an aluminium, copper or rubber rod for fine correction, and tighten only when the joint feels smooth with no catch. The acceptance condition is no visible step, no offset, no gap.

That level of care is proportionate to the duty. This machine has forty slides, each of which crosses every joint once per lap. At a 100-second lap that is well over a thousand crossings per slide per shift, all in the same place. A joint with a local discontinuity does not cause one problem — it causes the same impact, the same roller load spike and the same noise, thousands of times a day, in one spot.

Chain last, with the guard off. The documented order is to remove the protective cover, loosen the retaining screws, back off the tension screws to slacken the chain, connect the chain end to end through its connecting pins and double-axis circlips, then tension and re-lock. Doing this before the rails are aligned means tensioning against a geometry that is about to change.

The machine has to reach its position before any of this matters. Segmentation exists because a 7.5 metre closed loop is built and tested whole, then taken apart to travel. The project documentation asks specifically that lift and doorway dimensions be checked to confirm the equipment can move through unobstructed, and that check belongs in the site review rather than on the delivery day. It covers the dimensions of each shipping segment, the loading door, corridor width, the lift car and its door aperture, turning radius at corners, the clearance needed to reassemble, and the access needed afterwards for maintenance. A machine can fit perfectly on the CAD floor plan and still be impossible to get into the building, and on a segmented system the number of sections is a decision that has to be made before manufacturing finishes, not after.

Parallelism is the fourth problem. Two guide paths have a relationship to each other as well as to the frame. If their spacing varies along the machine, the carriage has to absorb it, and depending on the roller architecture that can mean lateral force, preload variation, binding or carriage distortion. The geometric chain runs rail A → frame → rail B → carriage and back, so a dual-rail machine cannot be judged by the accuracy of one rail in isolation.

  1. Commissioning and service of this Vertically Mounted Dual Rail Conveyor

Before power on, the documented checks are: clear debris that could obstruct motion, move the machine manually through its travel to check for interference, verify the structural connections, adjust the origin sensor to its effective position, and confirm the wiring. The manual interference check deserves the most attention, because a CAD review cannot reproduce field cable routing, fixture installation, sensor brackets, guarding or as-built fastener positions.

Factory testing on a machine like this should demonstrate relationships, not just rotation. Six are worth agreeing in advance: that every carriage completes the full loop without interference; that slides cross every segment joint without abnormal impact or noise; that the index sequence delivers each carriage to each station; that the locator engages and releases correctly after every move; that the complete tooling envelope stays clear through both returns; and that home sensing, index commands, station stops and locator actions occur in the intended order. Test footage documenting these is worth more than footage that simply shows the machine running.

In service, the documented lubrication regime gives three options for the rails and rollers: a WD-40 type spray about weekly, a liquid guide-rail oil such as ISO 46 every 15 to 20 days, or a solid grease on a 55 to 75 day cycle. Beyond that, organise attention around relationships rather than parts:

Symptom Usually traces back to First checks
Roller noise appearing at one location per lap A degrading rail joint at that point Inspect that joint for step, gap or offset; re-check the segment alignment before adjusting anything else
Station behaviour changing over weeks Chain elongation or tension loss on one of the two rails Compare tension on both chains; check against the commissioning value rather than a single reading
One carriage repeatable, its neighbour not The shared locating shaft, or wear on that carriage’s own locating features Compare repeatability at both ends of a shared shaft; inspect the carriage-side accessories
Apparent conveyor repeatability problem Loose tooling on the carriage rather than the conveyor Check fixture fastening before investigating the transport chain
Fastener loosening in a high-vibration installation Environment rather than machine condition Follow the documented periodic tightening of connection fasteners

Where abnormal noise appears, the documented instruction is to stop and investigate rather than continue. On a closed loop that is more than caution: the same defect repeats every single cycle.

Factory test video, clearest continuous indexing sequence: Dual-Rail Indexed Conveyor — Factory Motion Validation. Trim to the index, settle, locate, release cycle

Packing video: it shows the segmented shipping split

  1. Worked example: the delivered configuration of this Vertically Mounted Dual Rail Conveyor

Group Item Specification Qty
Track 180° return module T23-S300R180 4
Track Straight rail LGT23-L7139 4
Track Slides HST300-180L-80W-15H 40
Transmission Chain 20A, 20 mm pitch, 14,800 mm, carbon steel 2
Transmission Sprockets 20A-26Z, carbon steel 4
Transmission Drive shaft / driven shafts / bearing sets 6006, purpose-made 1 / 2 / 4
Transmission Chain guide channels Polymer, purpose-made 36
Transmission Carriage-to-chain connection blocks 45# steel with bronze bushing 40
Transmission Tension structures 45#, purpose-made 4
Positioning Pneumatic cylinders Airtec MU20×15S, magnet, two-wire magnetic switch, speed control connector 12
Positioning Locating shafts / bearing seats Purpose-made 12 / 24
Positioning Locating arms / followers Purpose-made / TM-CF8V 20 / 20
Positioning Carrier-side locating accessories Purpose-made 40
Structure Base support plates 7,306 × 330 × 20 mm, 45# 2
Structure Slide connecting plates Purpose-made 20
Structure Support rods / mounting flanges / feet Purpose-made 9 / 18 / 18
Structure Motor mount / connecting plates Purpose-made 1 / 4
Drive Servo motor Delta ECM-B3M-K21315RS1, medium inertia, 1.5 kW, 3,000 rpm, fed from the drive output, with 5 m power cable 1
Drive Servo drive Delta ASD-B3-1543-L, 380 V three-phase site supply, pulse interface, with 5 m encoder cable 1
Drive Precision gear reducer TM PGH115-L2-22-110-145-M8-A32, 50:1 1
Drive Coupling XO GXCG-8268-3232 1
Control Origin sensor Omron E2B-S08LN04-WP-C1, NPN 1
Control Motion controller Trio MC405-P827, 24 V input 1
Control HMI Trio Uniplay 10-A, 10.1 in 1
Option Bellows protection covers Available, not fitted on this build —

Resulting machine characteristics

Characteristic Value
System code TMB02-T23-S300R180-Y740-20LK20-L7139-C20
Layout / installation Oval, dual rail / vertical-mounted
Machine envelope 7,469 × 875 × 900 mm
Return diameter 300 mm
Carriages / slides / positioned 20 / 40 / 20
Carriage pitch 740 +0.3 mm (37 chain teeth)
Carriage loop / chain loop 15,220 mm / 14,800 mm per rail
Return speed ratio ≈ 1.81
Step / full lap 5 s per station / 100 s
Minimum index time ≈ 1.62 s, leaving ≈ 3.38 s for settle, locate, process and release
Average conveying speed 148 mm/s (0.52 m/s drivetrain ceiling)
Minimum acceleration ramp 200 ms each end
Payload 10 kg per carriage (200 kg in circulation)
Repeat positioning accuracy ±0.05 mm at the locating stations
Site electrical supply 380 V three-phase to the servo drive
Shipping Three segments per side, matched-reference reassembly

The 3D assembly was produced in SolidWorks and reviewed for carriage circulation through both returns, straight-to-return transition, adjacent-carriage clearance, the complete tooling envelope through the curve, locator access and maintenance access before release to manufacturing. That workflow is described in Circular Conveyor System R&D Capability, and the geometric verification that follows it in Circular Conveyor System Quality Control.

  1. What to prepare for a Vertically Mounted Dual Rail Conveyor

Nine inputs let a supplier close the geometry and the drive on the first pass rather than estimate them:

  1. Workpiece — dimensions, mass, orientation and any contact restrictions.
  2. Fixture — footprint, clamping method, tooling mass, and the process forces it transmits with their direction.
  3. Carriage envelope — required plate size, mounting zones, and any tooling that projects beyond the plate.
  4. Centre of gravity relative to the intended rail spacing, and whether it shifts during the process.
  5. Station sequence — loading, processing, inspection, unloading, and which stations need independent release.
  6. Index time and dwell time, stated separately.
  7. Required positioning, with the measurement point named.
  8. Installation envelope and access route — floor area and height at the final position, plus the loading door, corridor, lift car and door aperture, and turning radius each shipping segment has to pass through. Also state the site electrical supply available to the drive.
  9. Mounting orientation, and whether anything on the carriage must survive inversion through the return.

Where a value is genuinely open, mark it as an open engineering item. A pitch labelled “TBC” invites a calculation; a pitch invented to fill a field gets built.

Frequently Asked Questions About Vertically Mounted Dual Rail Conveyor

Does forty slides mean forty carriages?

No. On a dual-rail machine each carriage runs on two slides, one in each guide path, tied by a connecting plate. Forty slides in this project is twenty carriages — and the documented 10 kg payload is per carriage, not per slide.

How is carriage pitch decided on a chain-driven loop?

It has to be a whole number of chain pitches, because carriages attach at chain links. In this project a 20 mm chain and a 740 mm carriage pitch give exactly 37 teeth between carriages. Pitch, carriage count and chain length are therefore one decision, not three.

Do two rails mean each carries half the load?

Not automatically. How the load divides depends on centre-of-gravity position, rail spacing, carriage stiffness, roller arrangement and the direction of the process force. Payload per carriage is one input; where that payload sits and what pushes on it are equally important.

What decides the minimum return diameter?

The sprocket. Its pitch circle has to fit inside the carriage return path with room for the rail, the chain guide and the carriage structure. In this project a 26-tooth sprocket at 20 mm pitch has an 83 mm pitch radius inside a 150 mm return radius.

Why does the carriage need a floating connection to the chain?

Because the carriage path and the chain path are different closed loops — 15,220 mm against 14,800 mm here — and they run at different radii through the returns. The connection absorbs that difference, which is why it is a guided sliding component rather than a clamp.

Is a five-second step the same as conveyor speed?

No. It is a station cycle. In this project the drivetrain allows a 740 mm index in about 1.6 seconds, leaving roughly 3.4 seconds for settling, locating, processing and release. Which part of the cycle actually limits throughput is worth establishing before the station design is fixed.

Why does the documentation specify a minimum acceleration time?

Because chain force scales inversely with ramp time. Cutting the ramp from 200 ms to 50 ms multiplies chain tension, sprocket torque, motor torque and the load on every connection block by four — without changing a single component. It is a load limit set from the controller.

What supply voltage does a machine like this need?

The figure that matters for site preparation is the drive’s input. On this project that is 380 V three-phase to the servo drive; the lower voltage quoted for the motor is the drive’s output to the motor, not a mains requirement. Confirm the input side when planning the electrical supply.

How does a 7.5 metre closed loop get into the building?

In segments. This machine is assembled and tested whole, then separated into matched sections for shipping and reassembled on site against engraved references. The project documentation asks for lift and doorway dimensions to be checked in advance, and the number of shipping segments should be settled before manufacturing finishes rather than discovered at delivery.

Does a servo drive establish the final working position?

Not on this machine. The servo performs transport, bringing the carriage into the capture range of the station; a mechanical secondary locating mechanism then establishes the datum before the process begins. The specified ±0.05 mm belongs to that complete arrangement, not to the servo alone.