How To Design a Timing Belt Circular Conveyor: Carrier Pitch, Belt Length and Corner Geometry

How carrier pitch, belt pitch length, pulley tooth count and corner radius lock together on a closed-loop Timing Belt Circular Conveyor-with a worked ten-carrier example?

Author: Mr. Xu ChangMing, engineering director, C Motion Limited | 31, Aug 2015 | Category: Technical Guide

Most closed-loop conveyor discussions stay qualitative for a long time. Payload is “light to medium”, accuracy is “high”, the loop is “about four metres by one point two”. Those descriptions are useful early, but at some point the layout has to close — literally. The belt has to meet itself after a whole number of teeth, the carriers have to sit at a spacing the stations can use, and the corner modules have to consume exactly the amount of path the straights leave over.

This guide covers that arithmetic layer. It works through how carrier pitch, belt pitch length, pulley tooth count, corner radius and cycle time constrain each other on a timing belt circular conveyor, using a real 10-carrier rectangular system as the worked example throughout.

If you are earlier in the process — still deciding whether a closed loop is the right architecture, how to map stations, or how to compare belt against chain — start instead with our companion guide, Rectangle Circular Conveyor Line: An Engineering Guide to Process Layout and System Selection. This piece assumes those questions are already answered and picks up where the numbers begin to bind.

A note on the example. The figures below come from one delivered C Motion project: a horizontal rectangular closed loop Timing Belt Circular Conveyor, ten carriers, 1,000 mm nominal pitch, 600 mm corner modules, AT20 timing belt, servo indexing with mechanical station locating. They are used to show how the relationships work, not as a specification you should copy. Your own module path lengths, pulley geometry and belt ratings must come from the drawings for the components you actually specify.

Customer concept sketch of a rectangular closed-loop conveyor with ten marked carrier positions

Customer concept sketch, rectangular loop with ten marked positions

  1. Why “belt drive” on a circular conveyor usually means timing belt

Before any calculation, one distinction matters, because it changes which numbers apply.

On a flat-belt conveyor, the belt itself is the load-carrying surface and the drive works by friction. Selection revolves around belt material, tracking, lagging and slip. On a circular conveyor line of the type discussed here, the belt does not carry the product at all. Precision guide rails carry the carriers; the belt only pulls them. And because indexed positioning cannot tolerate slip, that belt is a toothed synchronous belt running on toothed pulleys — a positive-engagement drive.

That has two consequences worth stating plainly. First, the classic flat-belt selection questions (PVC versus PU surface, splice type, tracking adjustment) are largely beside the point. What matters instead is tooth pitch, tooth count, tension member construction and minimum pulley diameter. Second, and more usefully for design, a toothed belt is discrete. It closes on a whole number of teeth, and every carrier attaches at a tooth. That discreteness is what makes the rest of this guide calculable rather than approximate.

The worked example uses an AT20 profile: a 20 mm tooth pitch with a deep trapezoidal tooth form and a steel-cord tension member in a polyurethane body — a common choice for linear positioning drives where the belt is loaded in traction rather than wrapped repeatedly at small radii.

  1. Carrier pitch × carrier count = belt pitch length

This is the first relationship to establish, and the one most often discovered too late.

Carriers on a synchronous-belt loop are clamped to the belt at fixed intervals. If the spacing between carriers is to be uniform, the belt’s total pitch length must divide evenly by the number of carriers. Which means:

Belt pitch length = carrier pitch × number of carriers

In the worked example, the requirement specified ten carriers at 1,000 mm centres. That gives a 10,000 mm belt — and the delivered configuration lists exactly an AT20-10000 mm belt. The relationship is not a coincidence or a convenient rounding; it is the constraint that fixed the loop.

Two further checks follow from the tooth pitch:

Check

Calculation

Result

Total belt teeth 10,000 mm ÷ 20 mm pitch 500 teeth
Teeth between adjacent carriers 500 teeth ÷ 10 carriers 50 teeth
Carrier pitch as a tooth multiple 1,000 mm ÷ 20 mm 50 — a whole number ✓

Both must come out as integers. If the requested carrier pitch is not a whole multiple of the belt’s tooth pitch, that pitch cannot be built with uniform spacing — the request has to move to the nearest valid value, or the carrier count has to change.

Note that this pitch is measured on the straight sections, where the belt and the carriers run parallel at the same speed. Around the corners the two separate, for reasons Section 4 works through. This is also worth flagging early in a project, because it means carrier pitch and carrier count are not two independent requests. Asking for “ten carriers, and can we make the pitch 1,050 mm instead” is really asking for a different belt, which is really asking for a different loop perimeter, which usually means different rail modules. On an AT20 belt, the available pitches near 1,000 mm are 980, 1,000 and 1,020 mm. Nothing in between exists.

  1. How much belt the corners consume in a Timing Belt Circular Conveyor

Once belt length is fixed, the pulleys decide how that length is distributed between corners and straights.

A timing pulley’s pitch-line circumference is simply its tooth count times the belt’s tooth pitch. The worked example uses AT20-72Z pulleys — 72 teeth:

  • Pitch-line circumference: 72 × 20 mm = 1,440 mm
  • Pitch diameter: 1,440 ÷ π = 4 mm (pitch radius ≈ 229.2 mm)

In a rectangular loop, the belt wraps four corner pulleys at 90° each. Those four wraps add up to 360° — one complete circumference — so the corners consume exactly one pulley circumference of belt, regardless of how the rectangle is proportioned:

Belt budget

Length

Total belt pitch length 10,000 mm
Consumed by four 90° pulley wraps 1,440 mm
Remaining across the four straight belt runs 8,560 mm

Diagram showing four 90-degree timing pulley wraps totalling one full pulley circumference on a rectangular conveyor loop

Diagram: four 90° pulley wraps summing to one full circumference

Two things follow. First, the straight runs are no longer free variables: once belt length and pulley size are set, the four straights have a fixed total, so lengthening one side shortens another. Second, pulley tooth count is a layout decision rather than a drivetrain detail. Move from 72 teeth to 60 and the corners consume 1,200 mm instead of 1,440 mm, freeing 240 mm for the straights and changing the achievable rectangle. The pulley cannot be selected after the frame is drawn.

One caution before the next section: the 8,560 mm above is the belt’s straight length, measured between pulley tangent points. It is not the same as the length of the straight rail the carriers run on. Those two numbers diverge, and the amount by which they diverge turns out to be one of the more informative figures in the whole layout.

  1. The carrier path and the belt path are two different loops

This is the part that surprises people the first time they model a closed loop properly, and it is the reason the carrier-to-belt connection on these machines is a purpose-made part rather than a bracket.

It is tempting to picture the belt as a constant offset of the rail — same shape, slightly smaller. It is not. The two are separate closed curves of different length, and both lengths can be calculated directly from the delivered configuration.

The carrier path is the guide rail: four straight modules plus four quarter-circle corner arcs. The belt path is the four straight runs between pulley tangent points plus the four 90° wraps from the previous section.

Path segment Carrier path (guide rail) Belt path (pitch line)

Difference

Straight sections

2 × 3,686 + 2 × 800 = 8,972 mm 10,000 − 1,440 = 8,560 mm 412 mm

Corner sections

4 × (π × 300 ÷ 2) = 1,885 mm 4 × 90° = 360° = 1,440 mm

445 mm

Closed loop total 10,857 mm 10,000 mm

857 mm

Corner geometry diagram comparing carrier guide-rail radius with timing belt pitch radius on a circular conveyor

Diagram: carrier path radius versus belt pitch radius through a corner

The corner difference is easy to see: the carrier follows a roughly 300 mm rail radius while the belt follows a 229 mm pulley pitch radius, so the same 90° sweep produces different arc lengths.

The straight difference is the interesting one, because on a straight the belt and the carrier run parallel at identical speed — those lengths ought to match, and they don’t. The explanation is that the corner pulleys do not sit at the centres of the rail arcs. They are set inboard. Divide the 412 mm across the eight straight-run ends and it resolves to about 51.5 mm of inset per tangent point: the belt starts climbing onto the pulley roughly 50 mm before the carrier reaches the beginning of the rail curve, and rejoins the straight roughly 50 mm after the carrier has left it.

That single figure explains the whole budget, and three practical consequences follow from it.

The transition zone is wider than the curved module. Belt and carrier stop moving in parallel about 50 mm before the geometric start of the curve. Interference checks, sensor placement and station clearance should therefore be run against the transition zone, not against the curved module’s nominal footprint.

The carrier-to-belt connection must float. Across a full lap the carrier travels 10,857 mm while its attachment point on the belt travels 10,000 mm, and the two paths are neither concentric nor parallel through the transitions. A rigid clamp would bind at the first corner. This is why the delivered configuration uses purpose-made connection components with bronze bushings — a guided sliding joint that keeps the carrier driven along the rail while the belt runs its own path. It is a wear interface, and it is worth asking a supplier about specifically: how much travel the joint provides, and how it is guided and lubricated.

Carriers accelerate through corners. Comparing the corner rows above, the carrier covers 1,885 mm of path while the belt covers 1,440 mm, a ratio of about 1.3. A carrier therefore travels roughly 30 % faster through a curve than along a straight, and it accelerates into and out of every transition even when belt speed is perfectly constant. That matters for anything unrestrained on the carrier, for tall or offset fixtures, and for a station placed on a curve — as this project required. A curve station inherits neither the speed profile nor the clearance conditions of a straight one, so it needs its own review.

It also follows that corner diameter cannot be swapped late. Changing the curved module changes the carrier arc, the pulley inset, the travel demanded of the joint, the corner speed ratio, the available straight length and the machine envelope, all at once. It is a first-round decision, not a value-engineering adjustment.

The 51.5 mm inset above is derived from the delivered belt, pulley and rail figures rather than read from a drawing. Take the exact pulley centre positions, carrier-path radius and belt pitch radius from the assembly drawing for your own configuration before using these relationships in a layout.

  1. Required inner space is not the machine envelope

A dimension arriving from a customer usually describes the space the process needs, not the space the machine occupies. Confusing the two is one of the more expensive mistakes available on a closed-loop project, because it is discovered at installation.

In the worked example, the requirement form carried “4,000 × 1,200 mm”. The dimensioned sketch attached to that form defined those figures explicitly as inner length and inner width — the clear opening that had to remain available inside the loop for the customer’s own equipment. The finished machine is necessarily larger, because outside that opening it still has to accommodate straight rail assemblies, curved modules, carrier and fixture overhang, the timing belt path, corner pulleys and their support plates, positioning assemblies, servo and gearbox mounting, frame profiles, sensor brackets, belt tensioners and maintenance access.

The safe sequence runs outward from the process:

process clearance → carrier path centreline → rail geometry → drive geometry → machine envelope

The unsafe sequence — take the quoted dimensions, build a frame, fit the conveyor inside — produces a loop whose usable opening is considerably smaller than the number everyone agreed to. When a dimension arrives without a label, the single most useful question to ask is: is that the space you need to keep clear, or the space the machine is allowed to occupy?

Engineering top view of a ten-carrier rectangular belt driven circular conveyor showing four corner modules and the clear inner opening

Engineering top view of the developed rectangular layout

  1. Turning a move time into a speed and a cycle

Requirement forms usually specify motion as a time per pitch. That figure needs converting before it means anything for throughput or for drive sizing.

The worked example specified 10 seconds to move one 1,000 mm carrier pitch, including positioning:

  • Average travel speed: 1,000 mm ÷ 10 s = 1 m/s
  • Full circulation, 10 index moves: ≈ 100 seconds per lap
  • Station throughput: one carrier presented per station every 10 seconds

Two cautions on that arithmetic. First, the average is not the peak. The 10 seconds contains acceleration, constant-velocity travel, deceleration, settling and the mechanical locating action. Peak belt speed is therefore meaningfully higher than 0.1 m/s, and it is the peak — together with acceleration torque on the total moving mass — that sizes the servo, reducer and belt width, not the average. Second, throughput is set by the slowest station’s process time, not by the conveyor. If a station needs 14 seconds of work, a 10-second index does not make the line run at 10 seconds.

When specifying, it is worth separating the two numbers the supplier actually needs: the index time (how long the move plus positioning may take) and the dwell time (how long the carrier must stand still for the process). Together they give the station cycle. A single “cycle time” figure without that split is ambiguous.

  1. Where positioning accuracy comes from

C Motion specifies ±0.05 mm repeat positioning accuracy for this class of circular conveyor line, and the worked example was built to that figure. It is worth being precise about how that number is achieved, because it is a system-level result rather than a property of any single component.

The servo, reducer and timing belt perform the transport function: they bring the carrier from one station into the capture range of the next. The datum is then established mechanically. In the delivered configuration this is done by pneumatic locating units acting on a positioning arm and cam follower fitted to the carrier, so that the final working position is set by hard mechanical features rather than by held servo torque against belt compliance.

That division of labour is the reason the figure is repeatable. A servo asked to hold position through a timing belt is working against belt stiffness, reducer behaviour, guide clearance and any process force applied at the station — pressing, fastening, dispensing or probing loads that may act vertically and horizontally, not only along the travel direction. A mechanical locator removes that chain from the equation at the moment accuracy matters.

The practical implication for specification: state where the accuracy is required and what will act on the carrier there. “±0.05 mm at six stations, with a 40 N downward press applied at three of them” is a specifiable requirement. “High accuracy” is not.

It also explains why a machine like this needs only one position sensor. The delivered configuration carries a single inductive sensor, used as the home reference. Because the carriers are clamped to the belt at fixed tooth intervals, once the loop is homed the controller knows where every carrier is by counting from that datum — there is no need for a sensor at each station to find the carrier. The station’s final accuracy then comes from the mechanical locator, not from sensing. A design that instead requires a sensor per station is usually a sign that the carriers are not positively linked to the drive. The same property has a second consequence for the locating hardware itself, which is the subject of the next section.

For how these locating groups are arranged around a longer loop, see the Oval Circular Conveyor Engineering Guide.

  1. Ten positioned carriers, six actuators in the Timing Belt Circular Conveyor.

The delivered configuration positions all ten carriers, but it does so with six pneumatic cylinders. That is not a shortfall — it is a direct consequence of the belt geometry in Sections 2 and 4, and it is worth understanding because it changes how positioning should be specified.

Each carrier gets its own locating hardware: a positioning arm and a cam follower mounted on the carrier itself. What is shared is the actuation. On the long straight sections, one locating shaft spans a full carrier pitch and acts on two carriers at once, driven by a single cylinder. The two short end sections carry one station each, so those get a shaft and cylinder to themselves.

Component Qty

Allocation

Carriers

10 —

Positioning arm

10 One per carrier

Positioning follower (cam follower)

10 One per carrier
Positioning accessories 10

One per carrier

Locating shaft 6

Four paired on the straights, one at each end section

Pneumatic cylinder 6

One per shaft

Shaft bearing assemblies 12

Two per shaft, supporting both ends

Eight carriers on the two long straights are therefore served by four shafts and four cylinders; the two end carriers add one each.

Why pairing works here.

Two carriers can share one actuator only if they arrive together and at a known, unchanging spacing. On this architecture both are guaranteed by the drive itself: every carrier is clamped to the same belt at a fixed fifty-tooth interval, so when the loop indexes one pitch, all ten arrive simultaneously, and adjacent carriers on a straight sit exactly 1,000 mm apart every single cycle. A shaft cut to span that pitch will always find both cam followers in the same place. On a system where carriers move independently, or where spacing can drift, this simply cannot be done.

Why the end stations cannot pair.

Each short section carries one carrier, so there is no neighbour to share with. More generally, carrier spacing measured along the rail is only constant on the straights — through the transitions the carrier runs about 30 % faster than the belt, so the relative geometry changes. Any station near or on a curve needs its own actuator.

What it buys, and what it costs.

Halving the cylinder count on the straights halves the valves, solenoid outputs, air lines and fittings that go with them, along with the leak paths and the commissioning time. The trade-off is that paired stations lose independence: two carriers on one shaft clamp and release together, so they must share a dwell time. If one of those two stations needs to hold longer than its neighbour, or to release early after a failed inspection, it has to be broken out onto its own actuator.

There is also a mechanical consequence worth checking. A shaft spanning a full carrier pitch and driven from one end applies locating force at two points, so torsional wind-up along the shaft shows up directly as a difference in repeatability between the near and far station. That is what the bearing supports at both ends of each shaft are for, and it is a reasonable thing to ask a supplier to demonstrate — measured repeatability at the far station of a shared shaft, not just at the driven end.

The specification lesson is that number of carriers requiring positioning and number of positioning actuators are two separate line items. A requirement form that only captures the first leaves the second to be inferred. State both, and state which stations need independent release.

  1. Belt selection questions that actually apply

With a toothed belt on a guide-rail carrier system, the selection questions differ from flat-belt practice.

Tooth pitch follows from the transmitted force and the pulley size you can accommodate. A coarser pitch such as AT20 carries more force per tooth and tolerates a larger pulley; a finer pitch allows a smaller pulley and finer positional resolution but less force per tooth.

Minimum pulley diameter is a hard constraint, not a guideline. Steel-cord synchronous belts have a rated minimum tooth count for the drive pulley, below which cord fatigue accelerates. Confirm that rating with the belt manufacturer before fixing corner geometry, because on a closed loop the corner pulleys and the drive pulley are often the same component.

Tension member and body material determine elongation under load and behaviour over temperature. Steel cord gives high stiffness and low creep, which is what indexed positioning wants; more elastic constructions trade positional stiffness for flexibility.

Belt width follows from transmitted torque and tooth shear capacity at the drive pulley, calculated against peak acceleration torque with the full moving mass — product, carrier, fixture and any carrier-mounted tooling.

Because the belt on this architecture is loaded in traction rather than flexed around tight radii at high frequency, corner-induced flex fatigue is less dominant a failure mode than it is on a friction flat-belt curve conveyor. Tension loss and tooth wear matter more.

  1. Maintenance for a synchronous-belt closed loop

Because the drive is positive-engagement, several classic flat-belt faults simply do not apply. A toothed belt on toothed pulleys does not slip and does not need tracking adjustment in the flat-belt sense. What it does do is lose tension over time, wear at the tooth flanks, and transmit the condition of the carrier running elements into positioning repeatability.

Inspection intervals should follow duty and observed condition rather than a fixed calendar — operating hours, cycle count, moving load, acceleration, contamination and component-manufacturer guidance all shift the appropriate frequency. Tension in particular typically needs re-checking after the initial run-in period and then at intervals set by measured drift, not weekly by default.

Symptom Usually traces back to First checks
Positioning repeatability drifting at some stations Belt tension loss, wear in the locating unit or its cam follower, carrier guide wear Verify belt tension against the commissioning value; inspect the locating arm, follower and its bearing; check guide clearance on the affected carriers
Noise or roughness through one corner Debris in the curved module, worn carrier running elements, pulley bearing condition Clean the curved module and belt guides; inspect that carrier’s running elements and the corner pulley bearing
Visible tooth flank wear, or belt riding up on the pulley Under-tension, pulley misalignment, or peak torque above the design condition Re-tension; check pulley shaft parallelism and axial alignment; confirm actual moving mass and acceleration against the design figures
A step or click at a straight-to-curve transition Rail joint alignment shifting, loose module fastening Re-check joint alignment and re-torque module fasteners
One station of a shared-shaft pair repeatable, the other not Torsional wind-up or lost motion along the locating shaft, or a worn follower at the far station Compare measured repeatability at both ends of the shaft; check shaft bearing supports, shaft-to-cylinder coupling and follower condition

Treat these as a starting diagnostic framework, not a substitute for the service documentation supplied with your machine. Trend matters more than any single reading — rising drive current, a locating unit that needs more frequent adjustment, or noise that was not there last month all indicate a developing condition well before a stoppage.

For the standing inspection philosophy and the general commissioning checklist, see the process-layer selection guide and Circular Conveyor System Quality Control.

  1. Operating environment and protection

The worked example was specified for a general indoor environment, and the recommended operating condition for a standard build is indoor room temperature, out of direct sunlight, free of corrosive or flammable gases, and free of liquids, oil mist and dust.

That baseline matters for the calculations above, because protection is not a surface treatment added at the end. Bellows covers change the moving envelope and add drag to the carrier; sealed running elements change the guide interface. Both need to be in the layout before the frame is fixed, not fitted afterwards.

Where contamination is part of the process rather than an exception, compare requirements against the IP65 Dust Proof Circular Conveyor Line architecture and the dedicated guide, IP65 Dust-Proof Circular Conveyor System: Protection Design, Bellows Covers and Engineering Selection, rather than assuming a standard build can be upgraded with minor modifications.

  1. Worked example: the delivered configuration

The system used throughout this guide was built as a horizontal rectangular closed loop with servo indexing and mechanical station locating. Its principal hardware set is shown below, as a reference for what a configuration of this scale actually contains.

3D assembly view of a ten-carrier rectangular belt drive circular conveyor line

3D assembly view of the delivered machine

Group

Item Specification Qty

Track

Curved rail module T23-S600R90 4

Track

Straight rail LGT23-L3686 2

Track

Straight rail LGT23-L800 2
Track Carrier slides HST600-100L-55W-18H

10

Transmission Timing belt AT20-10000 mm

1

Transmission Timing pulleys AT20-72Z

4

Transmission Pulley shafts and bearing assemblies Purpose-made

4 each

Transmission

Belt guide baffles POM 8

Transmission

Carrier-to-belt connection blocks Steel with bronze bushing 10

Transmission

Tensioning assemblies Purpose-made 4
Positioning Pneumatic cylinders AirTAC

6

Positioning Locating shafts Purpose-made

6

Positioning Shaft bearing assemblies Purpose-made

12

Positioning

Carrier locating arms Purpose-made 10

Positioning

Carrier cam followers TM-CF8V 10
Positioning Locating accessories Purpose-made

10

Structure Corner support plates 460 × 460 × 25 mm, AL6061

4

Structure

Aluminium profile, motor mount, brackets, connecting plates Purpose-made Set

Drive

Servo motor and drive 1.0 kW, pulse command, with 5 m encoder and power cables

1

Drive Precision gear reducer Helical-tooth planetary, PGH115 frame

1

Control

Motion controller Trio MC405-P827, 24 V input, pulse-and-direction capable 1
Control HMI Trio UNIPLAY 10-A, 10.1 in

1

Control

Home reference sensor Inductive sensor, Omron 1
Option Bellows protection covers Available, not fitted on this build

—

Complete system code: TMX01-T23-S600R90-Y1000-10LK10-L3686-L800-T20

The 3D assembly for this configuration was produced in SolidWorks and reviewed for carrier circulation through every corner, straight-to-curve transition, adjacent-carrier clearance, central opening, locating-unit placement, drive and gearbox clearance, sensor mounting and maintenance access before release to manufacturing. That review sequence is described in Circular Conveyor System R&D Capability.

  1. The geometry inputs to send with an enquiry

The process-layer guide already lists the full engineering brief. If you want the geometry to be checkable on the first pass, these six inputs are the ones that let a supplier close the loop arithmetically rather than estimate it:

  1. Number of carriers in circulation, how many need station locating, and which of those need to be released independently of their neighbours.
  2. Required carrier pitch, or the station spacing that pitch has to satisfy — flagged as fixed or negotiable.
  3. Clear inner opening that must remain available inside the loop, labelled explicitly as inner space rather than machine envelope.
  4. Maximum machine envelope available on the floor, as a separate figure.
  5. Index time and dwell time per station, stated separately.
  6. Whether any station sits on a curve, and what acts on the carrier there.

Where a value is genuinely open, mark it as an open engineering item rather than substituting a placeholder. A pitch labelled “TBC” is far more useful to a designer than a pitch invented to fill a field, because the first invites a calculation and the second gets built.

Frequently Asked Questions About Timing Belt Circular Conveyor

Can I choose carrier pitch and carrier count independently?

No. On a synchronous-belt loop the two multiply to give the belt pitch length, so fixing one constrains the other. The pitch also has to be a whole multiple of the belt’s tooth pitch — on a 20 mm pitch belt, 1,000 mm works and 1,050 mm does not.

How do I work out how much belt the corners will use?

Multiply the pulley’s tooth count by the belt’s tooth pitch to get its pitch-line circumference. On a rectangular loop the four 90° wraps total 360°, so the corners consume exactly one full circumference. Whatever remains is distributed across the straights.

Why does a carrier need a floating connection to the belt?

Because the carrier path and the belt path are two different closed loops. In the worked example the guide rail measures 10,857 mm around while the belt measures 10,000 mm, and the two are neither concentric nor parallel through the corner transitions. The joint has to absorb that relative movement, which is why it is a guided sliding component rather than a clamp.

Does a servo motor by itself deliver ±0.05 mm carrier positioning?

No, and it is not asked to. The servo drive brings the carrier into the capture range of the station; a mechanical locating unit then establishes the datum. The specified repeatability is a property of that complete arrangement, including guide accuracy, belt stiffness, reducer backlash and the locating hardware.

Can a carrier stop and be worked on at a curved section?

It can be designed for, and this project required it, but it is a distinct requirement rather than an extension of straight-section behaviour. Carrier orientation, adjacent-carrier clearance and locating-component clearance all change through a curve, so a curve station has to be reviewed on its own terms.

How do I convert a required move time into a conveyor speed?

Divide carrier pitch by the specified move time for the average travel speed, then multiply the move time by the carrier count for a full circulation. Size the drive from the peak speed and acceleration rather than the average, and remember that line throughput is governed by the slowest station’s process time.

Do ten positioned carriers need ten positioning actuators?

Not necessarily. Because every carrier is clamped to the same belt at a fixed tooth interval, adjacent carriers on a straight always arrive together at exactly one pitch apart, so one shaft and one cylinder can locate two carriers. In the worked example ten positioned carriers are served by six cylinders. The trade-off is that paired stations clamp and release together and therefore share a dwell time.

Why is the straight rail longer than the belt’s straight run?

Because the corner pulleys sit inboard of the rail arc centres. In the worked example the four straight rails total 8,972 mm while the belt’s straight runs total 8,560 mm — a difference that resolves to about 51.5 mm of pulley inset at each of the eight straight-run ends. The practical effect is that the belt begins wrapping the pulley before the carrier reaches the curve, so the real transition zone is wider than the curved module itself.

Is required inner space the same as overall machine size?

No. Inner space is the clear opening kept available inside the loop. The finished envelope adds rail modules, carrier overhang, the belt path, corner pulleys and their support plates, drive hardware, frame and service clearance. Always confirm which of the two a quoted dimension refers to.

Related resources about Timing Belt Circular Conveyor

Download the E-catalogue and technical instructions, or send your layout and requirement data our team for customized design for you or visit our video gallery for more finished projects.

How to Make Circular Conveyor Maintenance and Troubleshooting?

Prev:

Next: