The modular range offers five arc-and-series combinations: V30 at 255, 351 or 468 mm, and V50 at 468 or 612 mm. Selecting between them is a sequence of exclusions, and the order matters more than the arithmetic — applied in the right order, most enquiries resolve before anything has to be read off a curve.
Order the exclusions by what they cost to apply
The published sequence is envelope, then capacity curve, then cycle formula. That order is right in principle — cheapest first — but it leaves the series minimum step time as a footnote when it is free to check and can eliminate half the range on its own.
| Order | Exclusion | What it costs to apply |
| 1 | Payload against the series limit | A comparison |
| 2 | Fixture envelope against arc diameter | A comparison |
| 3 | Required index against the series minimum step time | One subtraction |
| 4 | Load and speed against the capacity curve | Reading a curve |
Three of the four are free. Do all three before opening a curve.

The four exclusions ordered by what each costs to apply, with three of the four free.
Exclusion 1 — payload against the series
V30 carries up to 20 kg, V50 up to 50 kg. Above 50 kg the modular range does not apply at all and the line is a configured build — see Modular Conveyor Standard Components for what is being given up.
Exclusion 2 — fixture envelope against arc diameter
Each arc has a maximum fixture size it will clear:
| Combination | Maximum fixture size |
| V30-255 | ≤ 200 mm |
| V30-351 | ≤ 250 mm |
| V30-468 | ≤ 300 mm |
| V50-468 | ≤ 400 mm |
| V50-612 | ≤ 500 mm |
This is a hard geometric exclusion requiring no interpretation, which is why it goes early. A 220 mm fixture eliminates V30-255 before anything else is considered.
The limit is not a fixed fraction of the arc, so it cannot be interpolated. As a proportion of arc diameter the published limits run 0.78, 0.71 and 0.64 across the V30 range and 0.85 and 0.82 across V50. The fraction falls as the V30 arc grows and is higher throughout on V50, which means the limit is not set by clearance to the arc alone — the slide group envelope is in it too. Do not estimate a limit for an arc that is not in the table, and do not scale one from a neighbour.

Fixture envelope limit divided by arc diameter, showing it is not a constant fraction.
Exclusion 3 — required index against the series minimum
Each series has a floor below which it is not offered, whatever any formula returns:
V30 will not index below 0.7 s. V50 will not index below 0.85 s.
This costs one subtraction and it eliminates a whole series outright when the required index is short. A line that needs a 0.8 s index cannot use V50 at any arc diameter, and finding that out before reading a capacity curve saves the curve reading entirely.
The reason the heavier series has the longer floor — settling time scaling with the mass it has to stop — is on Conveyor Cycle Time Calculation.
Exclusion 4 — load and speed against the capacity curve
Attainable speed falls as load per slide rises, and falls faster on a smaller arc. Each combination has its own curve of speed against single-slide load.
Read the curve at the actual fixture weight. If the required speed sits above the curve, that combination is out — no configuration change recovers it, because the limit is the inertia the carrier generates entering and leaving the arc.
The required speed to read against is not the distance-over-cycle average:
Max speed = station pitch ÷ (cutting step time − 0.6 s)
The 0.6 s is fixed overhead — acceleration, deceleration, settling, and engaging and releasing the positioning mechanism — and it is gone before the carrier travels anywhere. On a 1.2 s index only half the time is available for travel. Full treatment, including the exact trapezoidal form that recovers margin on a marginal line, on Conveyor Cycle Time Calculation.
Worked sequence — V30W
Requirement: fixture 220 × 220 × 100 mm, 5 kg, maximum speed 600 mm/s.
- 5 kg is inside V30. Both series remain.
- Fixture envelope. 220 mm exceeds the 200 mm limit of V30-255. Exclude 255.
- Series minimum. No exclusion at this index.
- Load and speed. Reading the capacity curve at 5 kg per slide, V30-351 does not reach 600 mm/s. Exclude 351.
- Select V30-468.
Worked sequence — V50
Requirement: fixture 450 × 450 × 100 mm, 25 kg, maximum speed 250 mm/s.
- 25 kg puts this in V50.
- Fixture envelope. 450 mm exceeds the 400 mm limit of V50-468. Exclude 468.
- Select V50-612.
The second example never needs the capacity curve — the envelope exclusion left one option. That is the normal outcome on larger fixtures and is exactly why the free exclusions go first.
Configuration options in Modular Circular Conveyor Selection once the combination is fixed
| Parameter | Options |
| Arc diameter | 255, 351, 468 (V30) / 468, 612 (V50) |
| Station cycle pitch | 100, 120, 140, 160, 180, 200 mm … |
| Station count | 2, 4, 6, 8, 10, 12 … |
| Positioning accuracy | ±0.5 mm without a mechanism, ±0.03 mm with one |
| Locator quantity | To suit station count |
| Straight section length | Standard lengths, custom available |
| Straight section count | Even number |
The ±0.03 mm figure is for chain drive with a positioning mechanism, which is what the modular range is. The ±0.05 mm figure that appears against “with positioning mechanism” elsewhere is the timing belt figure and does not apply here. Always state the drive type alongside the accuracy — Circular Conveyor Positioning Accuracy.
Three constraints inside that table are easy to miss:
Minimum station pitch is 100 mm, in increments of 20 mm. A process that wants 110 mm spacing does not get it. The floor comes from the carrier itself: the V30 slide is 95 mm long, so at 100 mm pitch there is about 5 mm between carriers — which is also all the clearance available for anything that overhangs the slide plate.
The number of straight sections must be even. The loop is symmetric; an odd count does not close.
Station count runs in even numbers. Combined with the even straight-section rule, an odd-station process is laid out as the next even number with one position unused.
That unused position is worth marking on the drawing rather than forgetting. It is the obvious place for a future station, and a line that has quietly had a bracket bolted to it has lost that option.
When the answer is “none of the five” in Modular Circular Conveyor Selection
If every combination is excluded, the requirement is usually one of four things, in descending order of how often it is the real cause:
The cycle is too short for the pitch. Check the 0.6 s overhead has been applied. A surprising number of impossible specifications become possible once the required speed is recalculated correctly — and a surprising number of possible-looking ones do not.
The index is below the series floor. 0.7 s on V30, 0.85 s on V50. No arc diameter recovers it, and the answer is a different line concept: splitting the process across two loops, or duplicating the bottleneck station so the loop can index more slowly.
The fixture is too tall. Fixture height does not appear in the envelope table, but it drives the load factor through the deceleration moment, which is what the capacity curve is ultimately expressing. Lowering the centre of gravity is usually more effective than moving up an arc size — Conveyor Slide Load Calculation.
The payload genuinely exceeds V50. Then the modular range does not apply and the line is a configured build.
One check belongs after the selection rather than inside it, because it can send you back a step: a sub-second index with a substantial fixture should be confirmed against the drive’s continuous-duty region, not only against the capacity curve. Kinematics and capacity can both pass while the drive spends the shift in its intermittent region.
Where Modular Circular Conveyor Selection usually goes wrong
Opening a capacity curve before the free exclusions are done. Three of the four cost nothing.
Interpolating a fixture envelope limit. The limits are not a fixed fraction of the arc diameter.
Quoting ±0.05 mm on a chain-driven modular line. That is the timing belt figure; chain with a mechanism is ±0.03 mm.
Treating the series minimum step time as a footnote. It is a free exclusion that can remove a whole series.
Laying out an odd station count as an odd loop. It does not close; use the next even number and record the spare position.
Checking speed and load but not the drive’s thermal duty. Kinematics is not the only limit.
Sources and references about Modular Circular Conveyor Selection
Primary sources are first-party. The five combinations, the fixture envelope limits, the series minimum step times, the configuration option table and the maximum speed expression are taken from the Circular Conveyor System catalogue (edition 2027.1) and from engineering confirmations recorded during its revision.
The reordered exclusion sequence is the published sequence with the series minimum promoted from a footnote to a step, on the ground that it is free to apply. The exclusions themselves and their thresholds are unchanged.
The envelope-limit ratios are the published limits divided by the published arc diameters, shown so a reader can see that they do not form a constant fraction.
The minimum-pitch reasoning compares the published 100 mm minimum against the published V30 slide length of 95 mm from Circular Conveyor Loop Parameters.