Most circular conveyor enquiries arrive with a required cycle time and a station pitch, and the question behind them is always the same: can the line move that far, that often, carrying that fixture?

Three published limits have to be satisfied before the answer is yes. Two of them are usually checked. The third — the one that catches people — is that not all of your cycle time is available for travelling. Two further limits are not published at all, and they are the ones that turn a line that passes the calculation into a line that does not hold up in production.

What “cycle time” has to mean before the formula works

The single most common error in a conveyor cycle time calculation happens before any arithmetic, in deciding which interval the number refers to. Two different intervals both get called cycle time.

Station cycle time is what the process sees: the carrier arrives, the process runs, the carrier leaves. Index step time is only the transfer portion — the interval from one carrier leaving a station to the next carrier being positioned at it. The relationship is:

station cycle = process dwell at the slowest station + index step time

index step time = travel time + 0.6 s

The loop indexes at one rate, so the slowest station sets it for every station. A line with eleven stations needing 0.8 s and one needing 2.2 s runs at 2.2 s plus the index, and the eleven fast stations stand idle the rest of the time. That is why splitting or duplicating a single bottleneck operation is almost always a better answer than making the conveyor faster — it attacks the term that is actually setting the rate.

The direction of the error matters. Substituting a full station cycle into a formula that expects the index step time makes the available travel window look longer than it is, which returns a lower required speed than the line really needs. The calculation passes, the quotation goes out, and the shortfall appears at commissioning.

The 0.6 second constant in Conveyor Cycle Time Calculation

Maximum running speed is published as:

Max speed = station pitch ÷ (cutting step time − 0.6 s)

The 0.6 seconds is not travel time. It is the fixed overhead consumed at every index, and it contains four distinct items:

0.6 s = acceleration + deceleration + settling + mechanism engage and release

Those four do not behave alike. Acceleration and deceleration scale with the speed being reached and the acceleration the line can apply, so they are not constant at all. Settling scales with carrier mass and structural stiffness. Mechanism engage and release is close to a true constant, set by cylinder stroke, bore and supply pressure. Publishing the sum as one number is defensible as a conservative envelope, but it hides the fact that only the last of the four is genuinely fixed.

The consequence of the constant is easy to miss. On a 1.2 second index, only 0.6 seconds is available for travel — half. On a 1.0 second index, only 0.4 seconds — 40%. On a 0.8 second index, 0.2 seconds, a quarter. The shorter the index, the smaller the proportion of it you can actually use, which is why cycle time requirements get hard very quickly below about one second.

Conveyor cycle time calculation — how a fixed 0.6 second overhead leaves only 50%, 40%, 25% and 14% of the index for travelling

Only part of the index is available for travelling. The 0.6 s overhead is the same in every row; the travel portion shrinks faster than the index does.

Worked example. Station pitch 320 mm, required index 1.2 s:

Max speed = 0.320 ÷ (1.2 − 0.6) = 0.320 ÷ 0.6 = 0.533 m/s

So the line must be able to run at 533 mm/s carrying the specified fixture. That is the requirement. Whether it can is the second and third limits.

What the formula assumes, and where the margin is

The published expression divides the full station pitch by the travel window, which is the same as assuming the carrier covers every millimetre of the pitch at peak speed. It cannot. It has to accelerate and decelerate, and it covers distance while doing so.

That makes the published formula conservative in a specific and quantifiable way, which is worth knowing when a line falls just short of a requirement. For a trapezoidal move of distance s at peak velocity v with acceleration and deceleration a, the move time is:

t = v/a + s/v

Solve that for v instead of dividing distance by time, and the peak speed the line actually has to reach is lower.

The same example, solved exactly. Take the 320 mm pitch and the 1.2 s index, and suppose the settling and mechanism portion of the overhead is 0.3 s, leaving 0.9 s in which the carrier may both accelerate and travel. At an acceleration of 5 m/s²:

v/5 + 0.320/v = 0.9 → v = 0.389 m/s

Against the published 0.533 m/s, that is 27% less peak speed for the same index — enough to move a selection from one arc diameter to another, or to bring a marginal load-versus-speed reading back inside the curve. (The 0.3 s split and the 5 m/s² are illustrative; both have to come from the line.)

Two cautions before anyone uses this to argue a line up a grade. The exact form needs the overhead split, which is the first of the two pending items above, and it needs a real acceleration figure rather than an assumed one. And it raises peak motor torque while lowering peak speed, which is the fourth limit further down. The published formula should stay the screening check; the trapezoidal form is for recovering margin on a specific line, with the numbers in hand.

Worth noting on profile shape: for a fixed move time, the split that minimises motor heating is equal thirds — a third accelerating, a third at speed, a third decelerating. A profile that sprints and coasts covers the same distance in the same time while drawing more heat, which matters at the cycle rates this product runs at.

Limit two: the minimum step time floor

Each slide series has a published minimum cutting step time below which it is not offered, regardless of what the formula returns:

Series Load capacity Minimum cutting step time Positioning accuracy
V30 loop system ≤ 20 kg ≥ 0.7 s ±0.03 mm
V50 loop system ≤ 50 kg ≥ 0.85 s ±0.03 mm

Note that the heavier series has the longer minimum step time, not the shorter. A V50 carries two and a half times the load of a V30 but cannot index as fast, because the mass it is accelerating and stopping is greater and the settling time that mass demands is longer. Load capacity and speed trade against each other; they do not come together.

The size of the step is informative if settling dominates the floor. Settling time on a mass supported by a compliant structure scales with the square root of mass over stiffness, so on mass alone a 2.5× heavier series would need √2.5 ≈ 1.58 times as long to settle. The published floors are in the ratio 0.85 ÷ 0.7 ≈ 1.21. Reading the gap between those two numbers backwards, the V50’s effective structural stiffness is roughly 1.7 times the V30’s — the heavier series is not simply a bigger slide, it is a stiffer one, and about two-thirds of the mass penalty has been engineered back out.

Both figures above are for chain drive with a positioning mechanism — see Circular Conveyor Positioning Accuracy for the drive-type dependency.

Limit three: the load-versus-speed curve

The first two limits say nothing about what the slide is carrying. The third does.

Attainable speed falls as load per slide rises, and it falls faster on a smaller arc. The published conveying capacity curves plot belt or chain speed against load per individual slide, with a separate curve for each arc diameter in the series.

Two effects are at work, and both push the same way:

Arc diameter. A carrier runs faster through the arc than along the straight section, because its attachment sits at a different effective radius from the drive element’s pitch line. The relationship is geometric and simple: if the carrier’s own path radius exceeds the drive element’s by an offset e, then

v(arc) ÷ v(straight) = 1 + e ÷ R

so the speed step is set by the offset as a fraction of the radius. For an illustrative 30 mm offset, that is about 24% on a 255 mm arc, 17% on 351, 13% on 468 and 10% on 612. The same hardware produces two and a half times the speed excursion on the smallest arc as on the largest, which is why a small arc is speed-limited at a lower load than a large one.

Load per slide. The heavier the fixture, the larger the inertia force at every start and stop. That force has to be reacted by the rollers, the drive element and the positioning mechanism, and it is what ultimately caps the speed.

The practical reading: if a line will not reach the required speed, opening out the arc diameter is usually a more effective change than stepping up the slide series, because it addresses the dominant term. It also costs floor space, which is the trade.

The consumption of the slide’s capacity by those inertia forces is what the load factor calculation quantifies — see Conveyor Slide Load Calculation.

The arc is a limit on the payload, not only on the line in Conveyor Cycle Time Calculation

The capacity curves describe what the conveyor can do. They say nothing about what the workpiece will tolerate, and on fast lines with unclamped parts that is frequently the binding constraint.

A carrier going round the arc is in circular motion, so everything it carries is subject to a lateral acceleration of v²/R, pointing outward, for the whole time it is in the curve. Using the worked example’s 0.533 m/s:

Arc diameter Lateral acceleration at 0.533 m/s
255 mm 2.23 m/s² (0.23 g)
468 mm 1.21 m/s² (0.12 g)
612 mm 0.93 m/s² (0.09 g)

A part resting in an open nest will slide when the lateral acceleration exceeds the friction available, and will tip when the ratio of lateral acceleration to gravity exceeds the ratio of its base half-width to the height of its centre of gravity. A part 40 mm wide with its centre of gravity 60 mm up tips at 0.33 g. At 0.23 g on the smallest arc it is inside that limit, but not by the margin most people assume, and a taller or narrower part crosses it.

Two further points follow. The lateral acceleration is present throughout the arc, not momentarily, so it is a sustained load on any clamp or nest rather than a transient. And the speed step described above appears at the two transitions into and out of the arc as an abrupt change, which the process sees as a jolt; it is the reason a line can index perfectly well and still shake liquid out of an open container or unseat a lightly held part.

Carrier speed steps up at arc entry and exit while lateral acceleration of v squared over R acts throughout the arc.

The carrier speeds up through the arc and the payload carries a lateral acceleration for the whole time it is in the curve.

Where this binds, the fixes are the same two as always: open the arc, or hold the part. Slowing the line is the third and is usually the requirement that could not be met in the first place.

Limit four: the drive’s thermal duty

A line can satisfy all three published limits and still fail, because none of them asks how hot the motor gets.

Every index is one acceleration, one traverse and one deceleration, followed by a dwell. The heating that matters is the root-mean-square torque across the whole repeating cycle, not the peak:

T(rms) = √( (T(a)²·t(a) + T(c)²·t(c) + T(d)²·t(d)) ÷ t(cycle) )

Two features of that expression decide whether a fast line is viable. The peak torque terms are squared, so they dominate — halving the acceleration time roughly doubles the acceleration torque and quadruples its contribution. And the dwell sits in the denominator only, contributing no heat while lengthening the cycle, so it is what pulls the RMS value back down.

The consequence is direct and often counterintuitive at quotation. Shortening the index on an existing line raises the accelerating torque and shortens the dwell that was carrying the cooling, so the RMS value rises on both counts at once. A line that ran comfortably at a 1.5 s cycle can be thermally marginal at 1.1 s without anything else having changed. The published speed and load limits will not catch it, because kinematically nothing is out of range.

This is why the servo power range that accompanies these systems is not a formality: it is the term that has to absorb a shortened cycle. Any enquiry that specifies a sub-second index with a substantial fixture should be checked against the drive’s continuous-duty region, not only against the capacity curves.

Putting the published limits together

The published selection sequence works through the three catalogue limits in order of what eliminates most options first.

V30 example — fixture 220 × 220 × 100 mm, 5 kg, required speed 600 mm/s:

  1. Eliminate by fixture size. A 220 mm fixture will not clear on the 255 mm arc. Exclude 255.
  2. Eliminate by weight and speed. Reading the capacity curve at 5 kg per slide, the 351 arc does not reach 600 mm/s. Exclude 351.
  3. V30-468.

V50 example — fixture 450 × 450 × 100 mm, 25 kg, required speed 250 mm/s:

  1. Eliminate by fixture size. A 450 mm fixture will not clear on the 468 mm arc. Exclude 468.
  2. V50-612.

The order matters. Fixture envelope against arc diameter is a hard geometric exclusion and takes no interpretation; load-against-speed requires reading a curve. Doing the geometry first removes options for free.

Two checks belong after the selection rather than inside it, because they can send you back a step. Run the chosen arc through the lateral acceleration figure at the required speed and confirm the payload tolerates it. Then confirm the index sits above the series minimum step time — a V50 selected on load alone may already be excluded on rate before anything else is considered.

Turning cycle time into a line layout in Conveyor Cycle Time Calculation

Once the arc is chosen, the straight sections follow from the number of slides and the pitch, and they are not free choices. Carriers are attached to the drive element at a fixed pitch, so the loop has to close on a whole number of them:

loop perimeter = number of slides × station pitch

The perimeter is the path the carriers travel: two straight runs plus the two arc ends, with the arcs measured at the carriers’ own path radius, not at the nominal arc designation. That single equation is the check every layout has to pass, and it quantises the station pitch: choose the arc and the slide count and the pitch is determined, or choose the pitch and the slide count and the straights are determined. Any two of the three, never all three.

The loop length relationship in the source data is printed as:

L2 × N = (pitch × number of slides − L1 − L3 contributions) ÷ 2 − L1 − L3 + correction

Worked for a V30 line, 8 slides at 320 mm pitch:

(320 × 8 − 640) ÷ 2 − L1 − L3 + 4 = 640 mm

And for a V50 line, 8 slides at 480 mm pitch:

(480 × 8 − 880) ÷ 2 − L1 − L3 + 5 = 640 mm

Both the number of L2 segments and their individual lengths are customisable, so the total straight-section length can be met with different segment counts to suit the frame and the station layout.

Where the calculation usually goes wrong in Conveyor Cycle Time Calculation

Forgetting the overhead. Specifying 400 mm pitch on a 0.9 s index and assuming 444 mm/s. The actual requirement is 400 ÷ 0.3 = 1,333 mm/s — three times higher, and outside what the load will allow on most arc sizes.

Using the station cycle where the index step time belongs. The most expensive version of the same mistake, because it errs in the flattering direction and the line looks easier than it is.

Sizing on average speed instead of peak. The published speed is what the line must reach during the travel portion, not the distance-over-cycle average.

Selecting the slide series on load alone. A 30 kg fixture selects V50, and V50’s minimum step time of 0.85 s may already exceed the required index — at which point the answer is not a bigger slide but a different line concept, such as splitting the process across two loops or increasing the number of parallel stations.

Sizing the line to the average station instead of the slowest one. The loop indexes at one rate. An average is not a rate any station actually runs at.

Checking speed and load but not heat. Kinematics and capacity curves both pass, and the drive spends the shift in its intermittent region.

Checking the conveyor but not the payload. The line holds its speed through the arc and the part does not stay where it was put.

How to Make Circular Conveyor Maintenance and Troubleshooting?

Sources and references about Conveyor Cycle Time Calculation

Primary sources are first-party. The 0.6 s overhead constant, the maximum speed expression, the series load capacities and minimum cutting step times, the positioning accuracy figures, the conveying capacity curves and the loop length expression are all taken from the Circular Conveyor System catalogue (edition 2027.1). Where a printed expression does not reconcile, that is stated at the point it appears rather than corrected silently.

Motion profile and drive duty. The trapezoidal move-time relationship, the root-mean-square torque expression and the practice of checking an application against the continuous-duty region of a motor’s torque-speed curve are standard servo sizing method rather than anything specific to this product. Freely readable treatments: Motion Control Tips / Design World, “How to calculate continuous and peak torque values for servo applications” (motioncontroltips.com, designworldonline.com); and Kollmorgen, Getting Started Sizing and Selecting Servos white paper (kollmorgen.com), which is also the source for the equal-thirds indexing profile being the most efficient shape with respect to RMS torque.

Mechanics. The lateral acceleration figures are v²/R applied to the published arc diameters. The tipping criterion is elementary statics — a body tips when the ratio of lateral acceleration to gravity exceeds the ratio of its base half-width to centre-of-gravity height. The settling-time scaling with the square root of mass over stiffness is the standard single-degree-of-freedom result. None of the three is quoted from a source; each is derived in the text so a reader can check it.

 

Want to select circular guide rail? When to make Circular Guide Rail Lubrication?

 