A closed loop is never one piece of rail. It is straight sections, arc segments, and the joints between them — and on a line that is not meeting its positioning specification, the joints are where to look first.
This page covers the dimensional facts that govern joint quality, what they mean when tolerances accumulate around a closed loop, what the carrier actually experiences as it crosses a joint at tolerance, and how to tell a joint problem from a preload problem in about thirty seconds.
Three facts that set the joint
Straight rail is limited to 4000 mm in one piece. Any loop with a straight section longer than that has a splice in it by necessity.
Arc segments of 90° and 180° are cut from a 360° ring, which leaves a cutting tolerance at each cut face of typically −0.2 mm. This is inherent to the production method, not a defect, and it cannot be adjusted out at assembly.
Every rail end carries a bolt 20 mm from the end face. R1 and R2 are published as 20 mm on every model in the range, regardless of whether the hole spacing is 30 mm or 90 mm. That is not a coincidence and it is not derived from the hole spacing: the end distance is fixed by the rail end section, and its purpose is exactly this — to put a fixing close to every rail end, which means close to every joint.
The consequence for cutting a rail to length is direct. The end distance cannot be used to absorb a non-standard length. Take the surplus out of an intermediate bay by adding a hole, and leave both ends at their 20 mm. A rail cut so that the last fixing sits well back from the end face has an unsupported end at exactly the place where support matters most.
Where that goes wrong at a joint is covered next. The selection-side treatment of hole positions and length quantisation is on Circular Guide Rail Selection.

A splice in plan and elevation, with the 20 mm end distance on each rail putting a fixing beside every joint.
Why an unsupported end matters more at a joint than anywhere else
In the middle of a rail, an over-long unsupported span is a stiffness problem: the slide deflects the rail slightly and the deflection recovers.
At a joint it is a geometry problem. Two rail ends meet, and if either end lifts under the slide, the two working surfaces are no longer coplanar at the moment the rollers are crossing between them. The slide pitches through a small angle as it transfers, and it does so differently depending on fixture mass, speed and direction of travel — which is exactly the signature of a positioning fault that appears intermittently and cannot be tuned out.
In service that reads as:
- positioning scatter at stations near a joint but not elsewhere on the loop
- an audible knock as the slide crosses, rising with speed
- a wear band developing on one side of the joint faster than the other
The joint tolerance, and what 0.03 mm actually does
|
Joint feature |
Tolerance |
|
Height step between the two working surfaces |
0.03 mm |
| Gap at the butt |
0.03 mm |
Those are small numbers and it is worth being specific about why, because “as small as possible” is not an engineering instruction and a fitter needs to know what a tenth of a millimetre would actually cost.
A step becomes a rotation, and the rotation gets amplified. When the leading roller climbs a step of height h while the trailing roller is still on the old surface, the carrier pitches by roughly h divided by the roller spacing along the track. On an illustrative 100 mm roller spacing, the 0.03 mm tolerance gives 3 × 10⁻⁴ rad, about a hundredth of a degree. That is the same order of rotation that the positioning accuracy page shows becoming 60 µm at a tool point 200 mm above the carrier datum — twice the entire repeat positioning budget of a chain-driven station, produced by a joint that is inside its tolerance.
This is the reason a joint should not sit at or immediately before a positioning station, and it is a layout decision rather than an assembly one.
A step also becomes a jolt, and the jolt scales with speed, not with the step. A roller of radius R meeting a step h has to lift through h over a horizontal run of about √(2Rh). Treating that as a smooth climb, the vertical acceleration works out at approximately v²/R — independent of the step height, because a bigger step also gives the roller a longer run to climb it. What the step height does set is the size of the velocity change:
Δv (vertical) ≈ v × √(2h/R)
On an illustrative 15 mm roller radius at 0.5 m/s, the 0.03 mm tolerance gives about 30 mm/s of vertical kick. Two things follow. The knock rises with the square of line speed, which is why a joint that was silent at commissioning announces itself when the line goes to full rate. And halving the step only reduces the kick by 30%, because the relation goes as the square root — so there is little to be gained by chasing a step far below tolerance, and a great deal to be lost by letting one drift above it.
Both relations are idealised: they treat the step as a smooth ramp, where a real rail end is a sharp edge and the true contact is more severe. They are given here to show the scaling — how the effect grows with speed and with step height — rather than as a number to design against, and the roller radius and roller spacing of the actual slide series should be substituted before either is quoted.
Step and gap are not equally critical in Circular Guide Rail Joint Accuracy
Both are published at 0.03 mm. They do not deserve equal attention, and knowing which one to chase saves time at assembly.
A gap is a short length of unsupported travel. As the roller spans it, its centre dips by roughly g²/(8R) — the sagitta of the chord. That relation is quadratic, which changes everything about how much headroom there is:
| Gap at the butt | Roller centre dip (R = 15 mm, illustrative) |
| 0.03 mm (tolerance) | under 0.01 µm |
| 0.5 mm | 2 µm |
| 1 mm | 8 µm |
| 2 mm | 33 µm |
At tolerance the gap does nothing measurable. It would take a gap thirty times the tolerance before the dip reached the same order as the step tolerance. The step is the binding constraint; the gap has enormous quadratic headroom.
That has a practical consequence at assembly, and it runs against instinct. Faced with a joint that will not sit right, the reflex is to close the gap. The gap is not the problem. Spend the effort on the step — on shimming, on the flatness of what the rail is bolted to, and on whether both ends are properly held down — and accept a gap that looks larger than it feels it should be. There is a second reason to accept it, which is thermal, below.

The step becomes a carrier rotation that is amplified at the tool point; the gap dips the roller by a quantity that goes as the square of the gap.
What the mounting frame has to deliver
The rail can only be as straight as what it is bolted to. The published requirement for the customer’s frame is:
|
Span |
Flatness |
|
Within any 3 m |
±0.15 mm |
| Within any 10 m |
±0.3 mm |
Read those correctly and they are less alarming than they look, but they are alarming in a different way than expected.
As a smooth deviation, the frame spec does not threaten repeatability. A 0.15 mm bow over 3 m is a radius of curvature of about 7,500 m. A carrier with a 100 mm roller spacing riding over that pitches by about 1.3 × 10⁻⁵ rad, which reaches under 3 µm even at a tool point 200 mm up. The carrier returns to the same place every pass, so repeatability at a station is untouched.
What it does move is absolute position. A 0.15 mm deviation is 0.15 mm of station position, and station-to-station absolute accuracy is the figure a robot picking from two stations without vision correction is actually working against. The frame specification is therefore an absolute accuracy specification, not a repeatability one, and it should be quoted that way to a customer who is testing against a machine coordinate system.
The spec is only meaningful if the deviation is smooth. A local step in the frame — at a frame weld, at a joint in a fabricated base, under a levelling foot that has settled — transfers straight through the mounting bolts into the rail and becomes a step in the working surface. A frame can be inside ±0.15 mm over 3 m and still be unusable if that 0.15 mm arrives in one place. Measure the frame for local deviation across each rail joint as well as for overall flatness.
Tolerance around a closed loop does not cancel
On a linear axis, a length tolerance at one joint is absorbed at the free end of the axis. A closed loop has no free end. Every straight section and every arc segment has to add up to a path that closes on itself, and any accumulated error has to go somewhere — into the last joint assembled, or into a forced fit distributed around the loop.
With four 90° arc segments each carrying a −0.2 mm cutting tolerance at both cut faces, the worst-case accumulation around one loop is eight times that figure, up to 1.6 mm. A loop built from two 180° segments has four cut faces and up to 0.8 mm. Every contribution has the same sign, because every cut face is short, so this is not a tolerance that partly cancels in the helpful direction — at best some faces are closer to nominal than others.
Set that against the 0.03 mm gap tolerance and the scale of the problem is plain: the accumulated shortfall is more than fifty times what the joints are allowed to absorb. It cannot be left in the joints.

Segments are cut from a 360 degree ring, and every cut face is short of nominal by about 0.2 mm.
Two consequences follow.
Set the straight sections last, not the arcs. Arc segments have fixed geometry that cannot be trimmed. Straight sections can be cut to suit — subject to putting the surplus in an intermediate bay and leaving the 20 mm end distances intact. Assembling arcs first and closing with the straights puts the accumulated tolerance where it can be absorbed. In practice this means the straight lengths on a layout drawing are nominal until the arcs are in place and measured, and a loop that has been apart for maintenance needs that measurement again rather than a rebuild to the original numbers.
Do not force the last joint closed. A loop that needs persuading to close is storing that force in the rail, which shows up as a varying sliding resistance and, over time, as accelerated wear at the segments carrying the preload.

A loop plan showing eight cut faces, the straights absorbing the accumulated shortfall, and twin-rail joints staggered against each other.
A closed loop has nowhere to grow
The same property that makes tolerance accumulate — no free end — applies to thermal expansion, and this is the part most often missed at assembly.
Take a loop with a 2,560 mm path in bearing steel, expanding at roughly 11.5 µm per metre per °C. A 15 °C rise from a cool morning to a running line grows the rail by about 0.44 mm around the loop. Distributed across eight joints that is 55 µm per joint — already larger than the 0.03 mm gap tolerance. A loop butted tight at assembly temperature is therefore in compression once it is warm, and the force has nowhere to go except into the rail and the mounting bolts.
This is the second reason not to chase the gap down to nothing. The gap tolerance should be read as a figure at assembly temperature, with the expected operating temperature rise budgeted into it.
The harder version of the same problem is differential expansion between the rail and the frame. Bearing steel moves at about 11.5 µm/m/°C and structural aluminium at about 23. Over a 3 m straight section and the same 15 °C rise, the frame grows about 0.52 mm more than the rail it is carrying. The rail is held by countersunk screws, which locate rather than clamp-and-slide, so that differential has to be taken up somewhere — in the screws, in the rail, or as movement at the joints.
Three things follow for a line that runs warm, and they belong in the layout rather than in the assembly instructions. Set the joint gaps against the temperature rise this line will actually see, not against ambient alone. On an aluminium frame, treat the differential against a steel rail as a design input and fix the rail from one datum point rather than assuming every fixing can hold. And state the assembly temperature alongside the gap when a joint is recorded, so that a later measurement is comparable. Where the temperature rise is large or the frame is aluminium, the gap allowance is agreed per application.
Staggering joints on a twin-rail loop
On a twin-rail assembly the joints in the two rails must be staggered, not aligned. The reason is worth stating because it also tells you how far.
If the two rails’ joints coincide, every roller on the carrier reaches a discontinuity at the same instant, and for that moment nothing is holding the carrier’s attitude — it is free to pitch and roll together. Stagger them and at least one rail is always on continuous surface, so the carrier remains located while the other side transfers.
The working rule that falls out of that is: the offset should be at least the carrier’s roller spacing along the direction of travel, so that no two rollers of the same carrier are on a joint simultaneously. An offset smaller than the roller spacing still leaves an instant where a roller on each rail is at a discontinuity together, which is the case the staggering was meant to remove.
The offset itself is agreed per layout; the roller-spacing rule above is the minimum that makes the staggering do its job.
Where a joint may and may not sit
Joint position is a layout decision and it is free at the drawing stage. Three constraints, in order of how much they cost to get wrong:
Clear of positioning stations. A joint at or immediately before a station puts a step in the surface the carrier is being datumed against. One carrier roller spacing of clearance is the minimum; more is better, and it costs nothing on a drawing.
Supported on both sides. This is automatic if the 20 mm end distances are intact on both rails, which is the whole point of the fixed end distance. It is not automatic on a rail that has been cut to length by someone applying a rule of thumb.
Not at the most compliant point of a bay. The rail is a beam between fixings and deflection between supports scales with the fourth power of the span, so mid-bay is the softest place on any rail. Since a joint brings its own fixings at 20 mm on each side, a well-cut joint is inherently well supported — but a joint is still better placed where the adjacent frame structure is stiff than over a long unsupported run of frame.
Measuring a joint in Circular Guide Rail Joint Accuracy
The two tolerances need two different instruments, which is worth saying because a single tool will not do both.
Gap: feeler gauge. A 0.03 mm blade is a standard size and the measurement is direct.
Step: dial indicator or lever probe, not feel. A 0.03 mm step is at or below reliable fingertip detection, and a straightedge and feeler will not resolve it across a butt. Traverse a lever probe across the joint on a rigid stand referenced to the machine base, in the direction of travel, and read the discontinuity.
Measure with the rail bolted down at full torque. Bolting a rail changes its local height, so a joint measured loose and then torqued has not been measured. This is also why a joint is re-measured after any work on the frame beneath it.
Measure both working surfaces. On a V or T section the two flanks are separate surfaces and they can step independently — a joint can be correct on one flank and out on the other, which reads as a roll of the carrier rather than a pitch.
Telling a joint fault from a preload fault in Circular Guide Rail Joint Accuracy
Both produce positioning scatter, and they are treated completely differently, so distinguishing them first saves a lot of time.
Push the slide along the guideway by hand and feel the resistance.
- Resistance constant over the whole travel, but higher or lower than the published value → preload problem. Adjust at the eccentric rollers. See Eccentric Roller Adjustment.
- Resistance rises and falls as the slide travels, peaking at particular places → joint or alignment problem. The peaks mark where the rail is not straight, where two sections are misaligned, or where an arc has been forced into position.
- Resistance at one place differs depending on which direction you push through it → a step, not a bow. Climbing a step and descending it are not the same, and a symmetric defect such as a bow or a forced arc will feel the same both ways.
- Resistance changes noticeably when the fixture is loaded or removed → a compliance problem rather than a geometry one: preload, a soft frame, or an unsupported rail end. Geometry errors feel the same loaded and unloaded.
This is the single most useful diagnostic on the whole product, because it separates the failure modes in about thirty seconds without instruments. Adjusting the preload down until the slide feels right at the tight spot is the wrong response to the second and third cases — it leaves the slide loose everywhere else and destroys the accuracy it was meant to recover.

Four resistance signatures felt by hand, each pointing at a different fault and a different remedy.
One caveat that has become important: not every slide has adjustable preload. The 68° roller series is supplied concentric only, as is T23A90C, so on those sizes the first branch has no remedy at the rollers and the diagnostic is telling you something about build or wear rather than about a setting. That makes correct joint work more important on those sizes, not less, because it is the adjustment that is still available.
Re-check after any rework for Circular Guide Rail Joint Accuracy
Any rail section replaced, any joint re-shimmed, any re-levelling of the mounting frame invalidates the slide preload setting, because that setting was made against the rail as it sat. Re-verify the sliding resistance after the work, not before.
The order of operations is the same every time, and each step invalidates the ones after it if it is done out of sequence:
- Frame levelled and checked for local deviation, not only overall flatness
- Arcs positioned and measured
- Straights cut to suit and fitted
- Joints measured for step and gap, bolted down at full torque
- Slide preload set against the rail as it now sits
- Positioning verified at the stations
Going back to step 1 or 2 means repeating everything after it. On a line whose slides have no eccentric adjustment, step 5 is not available as a recovery, which makes getting steps 1 to 4 right the only route to the specification.
How to Make Circular Conveyor Maintenance and Troubleshooting?
Sources and references
Primary sources are first-party. The 4000 mm single-piece length, the −0.2 mm cut-face tolerance, the 20 mm end distances, the 0.03 mm step and gap tolerances, the ±0.15 mm / 3 m and ±0.3 mm / 10 m frame flatness figures, the twin-rail staggering requirement and the concentric-only roller sizes are all taken from the Circular Conveyor System catalogue (edition 2027.1) and from engineering confirmations recorded during its revision.
Mechanics. The step-to-pitch relation, the √(2Rh) climb geometry and the resulting Δv ≈ v√(2h/R), the g²/(8R) sagitta for a roller spanning a gap, the L²/(8s) radius of a shallow bow and the fourth-power relation between support span and deflection are all standard geometry and beam results, derived in the text so a reader can check them. Roller radius and roller spacing are illustrative throughout and are flagged where used.
Material data. Linear thermal expansion coefficients are standard published values for bearing and alloy steels (approximately 11.5 µm/m/°C) and structural aluminium alloy (approximately 23 µm/m/°C).
Circular Conveyor System Manufacturer