Circular guide rail alignment means lining up the arc segments and straight rails of a circular conveyor on their frame, so a carriage rolls round the whole loop without a bump or a tilt at any joint. Elevator guide rails and profile-rail linear guides are aligned by other methods and are not covered here.

To align a circular guide rail: level the frame and fix one datum straight. Align each following segment to it in order, set every arc tangent to its straights, and close the loop at one planned joint. Set roller preload last, then check each joint with a dial indicator, push a carriage round and record the readings.

On loops we supply, the first and hardest part is done before shipping. The loop is pre-assembled, aligned and measured with a laser interferometer, then numbered and shipped in sections. On site, the work is re-assembly in order, followed by checking and recording.

Circular conveyor lines being assembled in the manufacturing facility, where each loop is aligned before shipping in sections.

Why Circular Guide Rail Alignment Differs From Linear Rails

Anyone who has fitted a profile-rail linear guide knows the routine. The master rail goes against a machined shoulder, the second rail follows it, and the screws are tightened from the centre out. A closed loop changes that routine at almost every point:

Aspect Profile-rail linear guide Circular guide rail
Reference A machined edge along the full rail No edge runs all the way round; one datum straight takes its place
Ends Free ends take up small errors No free end; errors are carried to the last joint
Preload Chosen as a class when the block is bought Set on site with eccentric rollers
Joints Only where long rails are butted At every arc-to-straight transition and every splice
Heat Growth runs out at the ends Growth stays inside the loop

The rolling elements differ as well. A ball-recirculating block absorbs part of a small rail error within its preload. Rollers running on an open V or T edge pass a step or offset straight to the carriage.

Errors also add up. A small step or shortfall left at one joint is not cancelled by the next one. Each is carried forward and lands at whichever joint is fitted last, so the order of work decides how much the closing joint has to take.

Profile-rail linear guide with a machined shoulder and free ends beside a circular guide rail loop with a datum straight.

Figure 1. A linear rail follows a machined shoulder and lets small errors out at its free ends. A loop has one datum straight, and small errors arrive at the last joint fitted.

Temperature works the same way. Bearing steel grows about 11.5 µm per metre for each degree Celsius, in line with the published thermal expansion of steel, and a closed loop has no free end to release it. The figures for gaps and accumulation are on the rail joint accuracy page.

Poor circular guide rail alignment shows up in service before anyone puts a gauge on it. Push resistance rises at the same spots on every lap. Rollers start to wear on one side, and locators have to pull carriages further to reach their datums.

Before Circular Guide Rail Installation: Tools, Frame and Temperature

Circular guide rail installation needs a short list of tools. Only the laser interferometer stays at the factory; the rest is used both there and on site.

Tool What it checks
Laser interferometer (factory) Straightness of the straights, parallelism of twin rails, tangency where arcs meet straights
Precision level and shims Frame level along and across the loop
Dial indicator on a magnetic base Height step at joints and at arc transitions
Feeler gauges Gap at each joint
Torque wrench Fixing screws tightened to torque, centre outward
Joint alignment fixture Brings each joint back to its set position

Start with the frame. The mounting surface has to meet the flatness figures on the joint accuracy page. Check the local level under each joint position as well, because a joint sitting over a dip will not hold its step.

Check the delivery before circular guide rail alignment starts. Match the section numbers against the alignment record and look over the dowel pins and keys for transit damage. Then clean every mating face. A burr on a joint face is enough to push the joint past its tolerance.

Isolate the drive before anyone pushes a carriage by hand. Disconnect the chain or belt, or lock out the motor, so the loop cannot index while someone is working on it.

Then choose when to measure. Align at a stable temperature close to the running one, and note it. A reading taken in a cold hall in winter will not match one taken in summer.

Circular Guide Rail Alignment at the Factory and on Site

At the factory, the complete loop is assembled and aligned, then measured with a laser interferometer. Each segment is numbered and the readings go into an alignment record, which ships with the sections.

On site, the job is to rebuild that same loop. Dowel pins, keys and locating blocks between straights and arcs put each piece back where it was, and the joint alignment fixture sets each joint. Indicator and feeler-gauge readings, plus a hand push, then confirm the result.

The record lists the factory readings by section and joint number. It gives every site reading a reference value, which is what turns a measurement into a check.

Circular guide rail alignment at the factory and on site: six factory steps feeding six site steps through the alignment record.

Figure 2. The factory pre-assembles, aligns, measures and numbers the loop. The site rebuilds it by number and compares every joint with the alignment record.

Loop sizes and section lengths for each model are in TallMan’s circular conveyor datasheets.

Step 1: Fix the Datum Straight

How do you align a circular guide rail with no reference edge? You create one. Choose the straight that carries the largest number of positioning stations as the datum, as our factory does.

The reason is practical. Stations that need the tightest positioning accuracy then sit on the reference itself, and any leftover error is pushed towards parts of the loop with no stations.

Level the datum straight along its length and across its width, then check its straightness. Shims under it set the height the whole loop will follow, so finish them before the next segment arrives. Tighten its screws to torque from the centre outward.

On site, fit the section numbered as the datum first. From here on it does not move, and every other segment is measured from it.

Step 2: Follow the Datum, Segment by Segment

The circular guide rail alignment procedure then works round the loop in one direction. Fit the next segment with its screws snug but not tight, and let its dowel pins or key seat it against the piece already fixed.

Set the joint with the alignment fixture. Step and gap should both sit within 0.03 mm. The step matters more, because it tilts a carriage as it crosses. The joint accuracy page shows how to read both with an indicator and a feeler gauge.

Only then tighten the new segment. Do not tighten two neighbouring segments before checking the joint between them, because a joint closed under load cannot be corrected without loosening both.

After each segment is tightened, re-check the joint behind it. Tightening can draw a segment slightly. Catching that at one joint is far quicker than hunting for it after the loop is closed.

Keep joints clear of positioning stations and supported on both sides. On a site rebuild, follow the section numbers so each joint lands where it sat at the factory.

Circular guide rail alignment sequence: datum straight first, then each segment in one direction to a closing joint on a straight.

Figure 3. Fit the datum (1), then work round in one direction (2–7). The closing joint sits on a straight, clear of stations and splices. Every joint is set to within 0.03 mm step and gap.

Step 3: Set Each Arc Tangent to Its Straights

Where an arc meets a straight, the arc’s working edge has to continue the straight’s edge without a sideways offset. The two top faces also have to meet without a height step.

At the factory, the laser interferometer measures that tangency directly. On site, set the indicator’s magnetic base on the straight and sweep the probe across the joint onto the arc. Repeat from the arc side back towards the straight. A reading that jumps at the joint means an offset or a step.

Small arcs need extra care during circular guide rail alignment. The same sideways offset turns a carriage more sharply at a small arc diameter, so it shows up in the hand push sooner than on a large one.

Push a single carriage slowly across each transition. Its resistance should stay the same, and it should not tilt.

Arcs are made in a standard series of diameters, listed in the circular guide rail selection guide. The pins and keys between arc and straight do the main work of putting each one back in line. The indicator confirms it.

Checking circular guide rail alignment where an arc meets a straight: dial indicator sweep, sideways offset and height step.

Figure 4. At an arc transition, check the working edges for a sideways offset and the top faces for a height step. A jump in the indicator reading at the joint points to one of them.

Step 4: Close the Loop at One Planned Joint

In circular guide rail alignment, the closing joint collects whatever the other joints left behind. Plan its position before work starts. Put it on a straight, away from positioning stations, with support on both sides.

Long straights add joints of their own. On the 80-carrier bottle cap loop, each straight runs 8,590 mm, more than twice the 4,000 mm of one rail, so splices sit inside the straights. Count those splices when choosing the closing position, and keep the closing joint clear of them.

Measure the closing gap before final tightening. If it is out of tolerance, do not force the last joint shut. Share the correction over the last few joints instead.

Pinned sections still allow this. Loosen the last few segments and re-set each joint with the fixture. Then tighten them again in order, checking each joint as before.

At the factory, the closing joint is set during pre-assembly, so on site it should go back to within its recorded reading. A closing joint that will not close on site points to a segment fitted out of sequence or a frame that has moved.

Step 5: Square Twin Rails to Each Other

On a dual-rail loop, circular guide rail alignment works rail by rail: align the second rail to the first, not to the frame. The frame only has to hold both rails; the carriage only sees the two of them.

The factory measures parallelism with the laser interferometer. On site, measure the spacing at both ends and the middle of every straight, and at each arc. Then push a carriage round as a working gauge.

Stagger the joints on the two rails. If both rails break at the same point, every roller on a carriage crosses a joint at once. The joint accuracy page gives the minimum offset.

On a vertical dual-rail loop, measure the spacing on the upper and lower runs. The lower run carries carriages upside down, so a spacing error there loads the rollers differently from the same error on top. Whether a second rail is needed at all depends on the duty: working conditions, and the speed and load the carriages see.

Vertical-mounted dual-rail circular conveyor with carriage plates installed, where rail spacing is checked on both runs.

Figure 5. On a vertical dual-rail loop the lower run carries carriages upside down, so rail spacing is measured on both runs.

Step 6: Set Roller Preload After the Rail Is Aligned

Rollers come last. Concentric rollers fix the carriage’s line, and eccentric rollers with a 2 mm offset close the gap to the set preload. Hold the eccentric stud still while tightening its nut, or the setting turns with it.

Set preload only once circular guide rail alignment is complete. Rollers tightened over a rail fault hide it for a while and wear in the meantime. The procedure and the sliding resistance values are on the eccentric roller adjustment page; roller pairing is covered on the V-groove roller page.

Push each carriage across the same joint before any full lap. One carriage that feels different from the rest at that joint has a roller setting problem. All carriages catching at the joint means the rail.

Then push one carriage round the whole loop by hand. Resistance should feel even. A rise that repeats at the same places on each lap points to a joint or the rail line, not to the rollers.

Verify and Record the Circular Guide Rail Alignment

Measure each point and write the readings down beside the factory record. This circular guide rail alignment checklist covers the site readings:

Check How Record
Every joint Dial indicator across the joint; feeler gauge in the gap Step and gap per joint number
Arc transitions Indicator swept from straight to arc and back Reading on each side
Twin-rail spacing Both ends and middle of each straight; each arc Spacing at each point
Push resistance One carriage pushed round the loop by hand Even, or where it rises
Conditions Ambient temperature during measurement Temperature and date

Compare each site reading with the factory reading for the same joint number. The factory record also holds the straightness and parallelism results from the interferometer, so the acceptance figures for the loop travel with it.

Sign the circular guide rail alignment record off before the drive is reconnected. A signed sheet with every joint number filled in is far more useful at the next service than a note saying the loop was checked.

The record follows the approach of ISO 230-1 on geometric accuracy of machine tools: state what was measured, and how. With the factory and site records side by side, any later change is easy to spot.

Circular guide rail alignment record sheet with seven site checks, from joint step and gap to sign-off before restart.

Figure 6. The site record: seven entries kept beside the factory record, signed before the drive is reconnected.

When a Circular Guide Rail Alignment Reading Does Not Match the Record

A difference from the factory reading means something changed between pre-assembly and the site. Work from the joint outward:

What you find Likely cause What to do
Step at one joint only Burr or dirt on the mating face; damaged pin Loosen both segments, clean or replace, re-set with the fixture
Steps at several joints along one straight Frame not level under that straight Re-level and re-shim, then re-check those joints
Closing gap out Segment out of sequence, or error carried round Check section numbers; share the correction over the last few joints
Offset at an arc transition Arc not fully seated on its pins or key Loosen the arc, seat it, sweep the indicator again
Push resistance rises in one place only Joint step or local rail line Indicator across the nearest joints before touching rollers

If the readings still will not match after these checks, stop before running the loop and send the record with the site readings.

Need help on site? On-site alignment support is available for re-assembly and commissioning. Request a Quote — Circular Conveyor System and send the layout.

When to Re-Check Circular Guide Rail Alignment

The readings taken at commissioning become the baseline for every later circular guide rail alignment check.

Re-check after any event that could move a rail, such as replacing a section or re-levelling the frame. A collision with the loop counts too. A change in push resistance is reason enough on its own.

Between those events, follow the maintenance schedule, which puts an indicator across one or two joints monthly or quarterly. Keep the rail lubricated to the rail lubrication routine too. A dry rail can feel like a misaligned one under a hand push.

Circular Guide Rail Alignment FAQ

How do I align a circular guide rail without a reference edge?

Make the reference yourself. Fix one straight as the datum, align every other segment to it in order, and close the loop at a single planned joint.

Which segment should be the datum?

The straight that carries the largest number of positioning stations. Those stations then sit on the reference itself.

How is circular guide rail alignment measured at the factory?

With a laser interferometer. It measures straightness of the straights, parallelism of twin rails and tangency where arcs meet straights. The results go into the alignment record that ships with the loop.

Why won’t the last joint fit?

Small errors at the other joints all arrive there. Keep the closing joint on a straight, and share any correction over the last few joints rather than forcing one.

Can the last few joints be adjusted when the sections are pinned?

Yes. Loosen the last few segments, re-set each joint with the alignment fixture, and tighten them again in order.

Should I set roller preload before or after aligning the rail?

After. Preload set on a misaligned rail hides the fault while the rollers wear, and it has to be set again once the rail is corrected.

Do the joints on twin rails need to be staggered?

Yes. Joints at the same point on both rails make every roller of a carriage cross a joint together. The minimum offset is given on the rail joint accuracy page.

Can circular guide rail alignment be done without a factory record?

Yes, in the same order: datum straight, segment by segment, tangent arcs, one closing joint, then preload. It takes longer because every joint is set from scratch. The site readings then become the first record for that loop.

When should the chain or belt be fitted?

After alignment, preload and sign-off. Until then the drive stays disconnected, so carriages can be pushed by hand and the loop cannot index.

From Factory Record to Site Sign-Off

Circular guide rail alignment done at the factory still has to be proven on site. The numbered sections, pins and fixture bring each joint back. The record shows whether it came back to the same reading.

Keep the signed site record with the factory record for the life of the loop. It is the reference for every later re-check, including after a section is replaced.