What are Circular Conveyor Loop Parameters: Turning a Station Count into a Line Length

Circular Conveyor Loop Parameters: Turning a Station Count into a Line Length

Author: ChangMing | 20th,Seot 2026| Category: Technical Guide

Once the series and arc are selected, the remaining question is dimensional: how long is the line, and how does it divide into sections? This page gives the two published loop parameter sets and the arithmetic that turns a station count and a pitch into a straight-section length.

The two published loop systems of Circular Conveyor Loop Parameters

V30 loop system V50 loop system
Load ≤ 20 kg ≤ 50 kg
Minimum cutting step time ≥ 0.7 s ≥ 0.85 s
Positioning accuracy ±0.03 mm ±0.03 mm
Drive Chain Chain
Mounting Horizontal Horizontal
A — slide length 95 mm 130 mm
B — slide width 108 mm 150 mm
C — slider spacing 100, 120, 140, 160 … 160, 180, 200, 220 …
D — arc diameter 255, 351, 468 mm 468, 612 mm
L1 — front section straight length 160.5 / 81 / 311.5 mm 548 / 187 mm
L2 — main frame straight length 640 / 960 / 1280 / custom 640 / 960 / 1280 / custom
L3 — rear section straight length 322.5 / 243 / 473.5 mm 297 / 438 mm
H 488 mm 571 mm
h 120 mm 126 mm

Both accuracy figures are chain drive with a positioning mechanism. Drive-type dependency is on Circular Conveyor Positioning Accuracy.

H and h here are the loop system’s overall and mounting-face heights, not the guide rail group figures that appear on the track set pages. Those run 35.5 to 61 mm and describe the rail group alone. The two sets of letters are not the same measurement, and comparing one against the other is a reliable way to arrive at a wrong clearance.

Three constraints on slider spacing

Minimum 100 mm on V30, 160 mm on V50. The floor comes from the carrier, not from the rail: the published slide length A is 95 mm on V30 and 130 mm on V50, so at minimum pitch there is roughly 5 mm between adjacent V30 carriers and 30 mm between V50 ones. That gap is also all the clearance available for anything that overhangs the slide plate — a fixture that projects beyond the carrier in the direction of travel does not fit at minimum pitch, whatever the load calculation says.

Increments of 20 mm. This follows from the chain pitch: the modular range is chain-driven at 20 mm pitch, and a station spacing that is not a whole number of chain pitches cannot repeat at every station.

Even station counts. Combined with the even straight-section count, this is why an odd station requirement is normally laid out as the next even number with one carrier position left unused.

The loop length arithmetic of Circular Conveyor Loop Parameters

A closed loop has no free end, so everything in it has to add up to a path that closes on itself. Carriers sit on the drive element at a fixed pitch, which gives the identity every layout has to satisfy:

loop path = slider spacing C × number of sliders P

That path is made up of the arc contribution at each end plus all the straight rail between them, so the straight requirement is what is left after the arcs:

total straight = (C × P) − arc contribution

and the main frame requirement is what is left after the two end sections have made their own straight contributions:

main frame total = total straight − L1 − L3

with the main frame total divided between the two sides of the loop and made up from sections of length L2.

Three points on using that correctly.

Measure the arc contribution at the carrier path radius, not at the nominal arc designation. The two are not the same figure, and the difference is not small on a large arc. The developed arc lengths for every standard diameter are tabulated on Circular Guide Rail Selection.

L1 and L3 are published per arc, which is why each series lists three or two values for them. Take the pair that belongs to the selected arc, not the first in the list.

Confirm the straight lengths against the measured arcs at assembly. Arc segments carry a cutting tolerance that accumulates around a closed loop and cannot be absorbed in the joints, so the straights are the element that takes it up. The layout figure is nominal until the arcs are in place — Circular Guide Rail Joint Accuracy.

Worked, as far as the identity goes. A V30 line with 8 sliders at C = 320 mm has 8 × 320 = 2,560 mm of path. On a 468 mm arc the two arc ends together make one full circle of that diameter, about 1,470 mm, leaving 1,090 mm of straight to be divided between the front section, the rear section and the main frames. Take L1 and L3 for the 468 arc from the table above and the main frame requirement follows.

Circular conveyor loop parameters: the closure identity and what makes up the straight requirement.

The closure identity broken into arc contribution, front and rear sections and main frames.

Aim the straight requirement at a multiple of 320

The standard main frame lengths are 640, 960 and 1280 mm — steps of 320 mm — with custom lengths available in between.

A loop whose main frame requirement lands on one of those figures is built entirely from standard sections. One that lands between them needs a custom section, which costs the lead time and the interchangeability that the modular range exists to provide. Since the pitch and the slider count are usually more negotiable than the section lengths, it is worth steering the straight requirement toward a multiple of 320 while the layout is still open.

N and L2 are both free — and that freedom has a use

The number of main frame sections and the length of each are both customisable. A 1,280 mm requirement can be met as one 1,280 mm section or two 640 mm sections, and the choice is usually made on handling and shipping.

There is a better reason to choose deliberately. Every main frame joint is a rail joint, and a rail joint at a positioning station puts the datum the locator pulls against on the least predictable part of the loop. So the arrangement to prefer is the one that keeps joints away from stations.

That is not automatic, and on some pitches it is systematically wrong. All three standard main frame lengths are multiples of 320 mm, so on a line whose station pitch divides 320 — 160 mm or 320 mm — joints and stations fall on the same interval and every joint can land on a station. On the other published pitches (100, 120, 140, 180, 200 mm) the two intervals do not divide each other and joints fall between stations.

Two ways out where the pitch is 160 or 320 mm: specify a custom main frame length that is not a multiple of the pitch, or offset the whole station set by half a pitch relative to the frame joints. Either is free at the drawing stage and neither is available afterwards.

Check it rather than assume it — the end section straight contributions offset where the first joint falls, so the coincidence depends on L1 as well as on L2 and C.

Frame joint positions against station positions, showing coincidence at 160 and 320 mm pitch

Main frame joints at 640 mm against station pitches of 320, 160 and 180 mm.

Checking the result against cycle time in Circular Conveyor Loop Parameters

Loop arithmetic gives a line that fits the station count. It does not confirm the line will run at the required rate. Take the resulting pitch back through:

Max speed = C ÷ (cutting step time − 0.6 s)

and check that speed against the capacity curve at the actual slide load. A V30 loop of 8 sliders at 320 mm pitch on a 1.2 s index needs 533 mm/s; whether it reaches that at the fixture weight is a curve reading. Both are on Conveyor Cycle Time Calculation.

If the resulting speed is unattainable, the lever is pitch, not line length. Reducing C reduces the required speed proportionally — at the cost of station count for a given loop, or of a longer loop for the same count.

Horizontal only, and what vertical would cost

Both published parameter sets state horizontal mounting. Vertical mounting is offered on configured lines, but the parameters above do not cover it, and the load picture changes materially: gravity moves from Fz to Fy.

That is not a small change. Across the slide range the lateral limit is roughly half the vertical one — on V30, Fy 120 N against Fz 250 N — so a vertical line’s static capacity is under half its horizontal capacity before any dynamics are considered. Run the load factor against Fy rather than assuming a horizontal parameter set transfers — Conveyor Slide Load Calculation.

Where loop layout usually goes wrong in Circular Conveyor Loop Parameters

Using the nominal arc diameter as the arc contribution. The carriers travel a different radius.

Taking the first L1 and L3 in the list. They are published per arc.

Ordering straight rail to the calculated length. Cut-face tolerance means the arcs are short; the straights absorb it, measured at assembly.

Laying out at 160 or 320 mm pitch without checking where the frame joints fall. The standard main frame lengths are multiples of 320.

Landing the main frame requirement between standard lengths when a small change of pitch would have landed it on one.

Comparing the loop system H against a track set H. They are different measurements.

Assuming a horizontal parameter set covers a vertical line. The governing limit changes axis and roughly halves.

Sources and references

Primary sources are first-party. Both loop system parameter tables, the slider spacing options, the standard main frame lengths, the chain pitch and the horizontal mounting statement are taken from the Circular Conveyor System catalogue (edition 2027.1) and from engineering confirmations recorded during its revision.

Loop arithmetic. The closure identity, the straight-length relation and the main frame relation are elementary geometry applied to the published parameters, worked in the text so a reader can check them. The arc contribution is stated as a quantity to take at the carrier path radius rather than assumed equal to the nominal diameter.

The minimum-pitch reasoning compares the published minimum spacings against the published slide lengths A. The joint-coincidence condition compares the published main frame lengths against the published pitch options; both are arithmetic on the table above.